Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Storage Cum Biomedical Waste Management Equipment Rooms At Dasmantpur During The Year 2023 24
|
| Description |
Civil Works
|
| Organisation | Government of Odisha |
| Tender Id | 2023_EICCL_93945_6 |
|
Reference Number |
S.E (R and B) KPT - 06/ 2023-24 |
| Tender Fee | 6000 |
| EMD | 11000 |
| Tender Value | - |
| Place | Office of the S.E R and B Division, Koraput |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in |
| Start Date | September 15, 2023 16:30 |
| End Date |
Expired
28/09/2023
Expired 1109 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Renovation and improvements to the existing control rooms to provide additional space for accommodating telecom equipment at various substations
Renovation and improvements to the existing control rooms to provide additional space for accommodating telecom equipment at various substations
Read moreEstablishment of integrated solid waste management facility in shankarpally municipality under nagarabhivrudhi grants recall.
Establishment of integrated solid waste management facility in shankarpally municipality under nagarabhivrudhi grants recall.
Read moreEstablishment of integrated solid waste management facility in shankarpally municipality under nagarabhivrudhi grants recall.
Establishment of integrated solid waste management facility in shankarpally municipality under nagarabhivrudhi grants recall.
Read moreConstruction of plastic waste management unit near segregation shed at wardhannapet mpdo office of wardhannapet (m) in warangal district est cost rs.,40.00 lakhs
Construction of plastic waste management unit near segregation shed at wardhannapet mpdo office of wardhannapet (m) in warangal district est cost rs.,40.00 lakhs
Read moreConstruction of a compost pit (including installation of dry & wet waste platforms, 5 windrow platforms, machine equipment, leachate drains & collection tank, road, fencing, and firefighting infrastructure) as per model design for wet waste processing at the office of nagar panchayat chandi (nalanda).
Construction of a compost pit (including installation of dry & wet waste platforms, 5 windrow platforms, machine equipment, leachate drains & collection tank, road, fencing, and firefighting infrastructure) as per model design for wet waste processing at the office of nagar panchayat chandi (nalanda).
Read moreSetting up of 120 tpd municipal solid waste processing treatment and management facility on epc and o and m basis at drcc in ramagundammunicipal corporation for a period of 5 years
Setting up of 120 tpd municipal solid waste processing treatment and management facility on epc and o and m basis at drcc in ramagundammunicipal corporation for a period of 5 years
Read moreDesign, construction, installation and commissioning (epc mode) of material recovery facility (mrf) for dry waste management of 05 tpd capacity for office of nagar panchayat chandi (nalanda) and operation and maintenance (o&m) of the plant for next 5 years
Design, construction, installation and commissioning (epc mode) of material recovery facility (mrf) for dry waste management of 05 tpd capacity for office of nagar panchayat chandi (nalanda) and operation and maintenance (o&m) of the plant for next 5 years
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreof your Industry type