Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Dark Fiber Leasing From Msetcl T318 To Raygadnagar Jc
|
| Description |
|
| Organisation | POWER GRID Corporation OF INDIA Limited | Ministry of Power |
| Tender Id | GEM/2024/B/5283161 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | August 13, 2024 14:31 |
| End Date |
Expired
23/08/2024
Expired 785 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|
| 1 | COMMUNICORE FIBERINFRA PRIVATE LIMITED | 17-08-2024 18:54:52 | MSE | Qualified |
Leasing of dark fiber of opgw laid on upptcl eht lines for 5 years
Leasing of dark fibers of opgw laid on upptcl eht lines for five years, renewable twice for period of 5 years each with mutual consent.
Read moreDark fiber lease from pnq26 to pnq27 for the period of three years.
Dark fiber lease from pnq26 to pnq27 for the period of three years.
Read moreDark fiber lease from hvdc butibori office to cicr for the period of two years.
Dark fiber lease from hvdc butibori office to cicr for the period of two years.
Read moreDark fiber lease service - point to point based - dry lease single mode intracity 1 aerial, underground na na
Dark fiber lease service - point to point based - dry lease single mode intracity 1 aerial, underground na na
Read moreDark fiber lease service - point to point based - dry lease single mode intracity 1 aerial, underground na na
Dark fiber lease service - point to point based - dry lease single mode intracity 1 aerial, underground na na
Read moreDark fiber lease service - point to point based - dry lease single mode intracity 1 aerial, underground na na
Dark fiber lease service - point to point based - dry lease single mode intracity 1 aerial, underground na na
Read moreConstruction of platform for the co-location space provided for the dark fiber lessee at 400 kv substation and 220 kv substation bina.
Construction of platform for the co-location space provided for the dark fiber lessee at 400 kv substation and 220 kv substation bina.
Read moreCp plus 4mp ip dome illucctv camera,8 ch poe full giga switch,outdoor rack,4 u rack,6 core fiber cable,jc box 2 way,pach cord,hard disc 10tb double sata,nvr 32 ch double sata,media converter dual giga,pvc back box 5x5,rj 45 connector,cat 6 armour cable,camera installation charges,fiber splicing charges,fiber laying charges
Cp plus 4mp ip dome illucctv camera,8 ch poe full giga switch,outdoor rack,4 u rack,6 core fiber cable,jc box 2 way,pach cord,hard disc 10tb double sata,nvr 32 ch double sata,media converter dual giga,pvc back box 5x5,rj 45 connector,cat 6 armour cable,camera installation charges,fiber splicing charges,fiber laying charges
Read moreHelmet fiber,hand shield fiber,chipping hammer,chisel cold,centre punch,stainless steel rule,scriber,flat tongs,hack saw frame,tip cleaner,screw driver,letter punch,magnifying glass,co2 gas pressure regulator,argon gas pressure regulator,flash back arrester cylinder mounted,multiangle magnetic clamp set,portable drilling machine,magnetic particle testing kit,fire extinguishers foam type and co2type,swaging and flooring tool kit 450 tubing,hammer slag 4 kg,ag4 grinder,auto dark helmet
Helmet fiber,hand shield fiber,chipping hammer,chisel cold,centre punch,stainless steel rule,scriber,flat tongs,hack saw frame,tip cleaner,screw driver,letter punch,magnifying glass,co2 gas pressure regulator,argon gas pressure regulator,flash back arrester cylinder mounted,multiangle magnetic clamp set,portable drilling machine,magnetic particle testing kit,fire extinguishers foam type and co2type,swaging and flooring tool kit 450 tubing,hammer slag 4 kg,ag4 grinder,auto dark helmet
Read more8 port poe switch with 2 sfp port,pvc conduit channel flexible conduit hdpe pipe,rack 2u 4u,6 core armored sm outdoor ofc cable,media converters fiber module,laying of ofc utp charges,junction box mounting clamps,patch cord pigtails jc boxes connectors clamps,mcb thimble din rail power connectors junction bow mounting clamps,installation and commissioning charges,internal storage device (ssd/hdd) (v2),ethernet cables,camera for cctv system (v3)
8 port poe switch with 2 sfp port,pvc conduit channel flexible conduit hdpe pipe,rack 2u 4u,6 core armored sm outdoor ofc cable,media converters fiber module,laying of ofc utp charges,junction box mounting clamps,patch cord pigtails jc boxes connectors clamps,mcb thimble din rail power connectors junction bow mounting clamps,installation and commissioning charges,internal storage device (ssd/hdd) (v2),ethernet cables,camera for cctv system (v3)
Read moreof your Industry type