Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply And Installation Of 2 (Two)nos. 160 Kw Star Delta Starter Panel In 6 Mgd Drinking Water Pump House For Pump Nos. 4 And 5 In Water Works.
|
| Description |
Supply And Installation Of 2 (Two)nos. 160 Kw Star Delta Starter Panel In 6 Mgd Drinking Water Pump House For Pump Nos. 4 And 5 In Water Works.
|
| Organisation | THE DURGAPUR PROJECTS LIMITED | State Govt. and UT |
| Tender Id | 2025_DPL_829408_1 |
|
Reference Number |
WBDPL-13.099/14/2025-GM-POW (DPL)-DPL/WW/E-352 Dated- 20.03.2025 |
| Tender Fee | 0 |
| EMD | 18800 |
| Tender Value | - |
| Place | Water Works, DPL |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1846997 |
| Start Date | March 20, 2025 21:30 |
| End Date |
Expired
01/04/2025
Expired 566 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of smart controller (fully automatic air break star delta starter panel) 12.5 h. p,supply of smart controller (fully automatic air break star delta starter panel) 15.0 h. p,supply of smart controller (fully automatic air break star delta starter panel) 17.5 h. p,supply of smart controller (fully automatic air break star delta starter panel) 20.0 h. p,supply of smart controller (fully automatic air break star delta starter panel) 22.5 h. p,supply of smart controller (fully automatic air break star delta starter panel) 25.0 h. p,supply of smart controller (fully automatic air break star delta starter panel) 27.5 h. p,supply of smart controller (fully automatic air break star delta starter panel) 30.0 h. p,supply of smart controller (fully automatic air break star delta starter panel) 35.0 h. p,supply of smart controller (fully automatic air break star delta starter panel) 40.0 h. p,supply of smart controller (fully automatic air break star delta starter panel) 45.0 h. p,supply of smart controller (fully
Supply of smart controller (fully automatic air break star delta starter panel) 12.5 h. p,supply of smart controller (fully automatic air break star delta starter panel) 15.0 h. p,supply of smart controller (fully automatic air break star delta starter panel) 17.5 h. p,supply of smart controller (fully automatic air break star delta starter panel) 20.0 h. p,supply of smart controller (fully automatic air break star delta starter panel) 22.5 h. p,supply of smart controller (fully automatic air break star delta starter panel) 25.0 h. p,supply of smart controller (fully automatic air break star delta starter panel) 27.5 h. p,supply of smart controller (fully automatic air break star delta starter panel) 30.0 h. p,supply of smart controller (fully automatic air break star delta starter panel) 35.0 h. p,supply of smart controller (fully automatic air break star delta starter panel) 40.0 h. p,supply of smart controller (fully automatic air break star delta starter panel) 45.0 h. p,supply of smart controller (fully
Read moreStar delta motor starter for three phase induction motors (v2)
Star delta motor starter for three phase induction motors (v2)
Read moreStarter delta starter contactor 415 vac 32a, 50hz motor rating 15kw with auxiliary contacts 1 no+ 1nc of star delta starter for radiator fan motor of lhb power caras
Starter delta starter contactor 415 vac 32a, 50hz motor rating 15kw with auxiliary contacts 1 no+ 1nc of star delta starter for radiator fan motor of lhb power caras
Read moreRepairing of 150hp, 550v star delta starter 02 nos and 200amp 550v acb switch of 7 pit madhusudanpur colliery
Repairing of 150hp, 550v star delta starter 02 nos and 200amp 550v acb switch of 7 pit madhusudanpur colliery
Read moreElectrical works related to the supply, installation, erection and commissioning of a new starter panel for the renovation of the 8 mgd drinking water pump house (2nd phase) at water works, dpl.
Electrical works related to the supply, installation, erection and commissioning of a new starter panel for the renovation of the 8 mgd drinking water pump house (2nd phase) at water works, dpl.
Read moreof your Industry type