Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Path With Chequered Tiles In Green Belt Along With Sector 4, Karnal
|
Description |
Construction Of Path With Chequered Tiles In Green Belt Along With Sector 4, Karnal
|
Organisation | Haryana Board Corporation | State Govt. and UT |
Tender Id | 2024_HBC_398127_1 |
Reference Number |
202447E96D1A 26B8 43D8 BEC3 B96BA658211C263HSV |
Tender Fee | 2180 |
EMD | 80380 |
Tender Value | |
Place | Karnal |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=474463 |
Start Date | August 08, 2024 19:30 |
End Date |
15/08/2024 ( Expired 275 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Expression of interest (eoi) from reputed contractors having experience in expressway/ highway/ irrigation/ railway/ metro/ high speed rail/ power sector india/ overseas
Expression of interest (eoi) from reputed 
 contractors having experience in expressway/ 
 highway/ irrigation/ railway/ metro/ high speed
 rail/ power sector india/ overseas
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreSelection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Selection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Read moreConstruction of 4-lane gf western bypass from design km 0.000 (km 181.000 on nh-146) near lahdara village junction on nh-146 km 20.200 (km 223.200 on nh-44) near berkheri guru village junction on nh-44 of length-20.200 km in mp on ham.
Construction of 4-lane gf western bypass from design km 0.000 (km 181.000 on nh-146) near lahdara village junction on nh-146 km 20.200 (km 223.200 on nh-44) near berkheri guru village junction on nh-44 of length-20.200 km in mp on ham.
Read moreImprovement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreIe services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham
Ie services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham
Read moreRehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreConstruction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode
Construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode
Read moreE-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read moreof your Industry type