Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Civil Works Incl Earthwork For Railway Formation, Blanketing Work,Mb, Ru Bs,Sb,Other Service Buildings,Staff Quarters,Platform Works Incl General Electrical Works Between..Single Line..Single Railway Line..From..In Chhattisgarh Over Secr
|
| Description |
Civil Works Incl Earthwork For Railway Formation, Blanketing Work,Mb, Ru Bs,Sb,Other Service Buildings,Staff Quarters,Platform Works Incl General Electrical Works Between..Single Line..Single Railway Line..From..In Chhattisgarh Over Secr
|
| Organisation | IRCON International Limited | Public Sector Undertakings |
| Tender Id | 2024_IRCON_184951_1 |
|
Reference Number |
IRCON/2059/CGRP/23 24/Urga Dhramjaigarh/Pkg 1B (R) |
| Tender Fee | 50000 |
| EMD | 79.69 Lakh |
| Tender Value | - |
| Place | Bilaspur, Chhattisgarh |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=202472 |
| Start Date | February 21, 2024 14:30 |
| End Date |
Expired
27/02/2024
Expired 961 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl
Jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl
Read moreBalance work of earthwork in formation, blanketing and construction of minor bridge no. 15,25,35 and 37 between the section of bhagauli(excluding) to bakhira (including) in connection with khalilabad- bahraich new b.g rail line project.
Balance work of earthwork in formation, blanketing and construction of minor bridge no. 15,25,35 and 37 between the section of bhagauli(excluding) to bakhira (including) in connection with khalilabad- bahraich new b.g rail line project.
Read moreBalance work of execution of earthwork in formation, blanketing and construction of minor bridge no. 40, 44, 46, 53 & 60 between the section of mehdawal (excluding) to kheshraha (excluding) in connection with khalilabad- bahraich new b.g rail line project.
Balance work of execution of earthwork in formation, blanketing and construction of minor bridge no. 40, 44, 46, 53 & 60 between the section of mehdawal (excluding) to kheshraha (excluding) in connection with khalilabad- bahraich new b.g rail line project.
Read moreEngineering procurement and construction (epc) for construction of new line work between including earth work, blanketing, minor bridges, major bridges, robs, lhs/rubs, track works, platform work, station building, fobs, other buildings and associated miscellaneous civil engineering works for 25t indian railway standard loading from bikramshila (incl) to katareah (incl) from ch. 0.50 km to 24.274 km with shivnarayanpur to shivnarayanpur y-link from ch. km 1.10 to 2.933 km and katareah y-
Engineering procurement and construction (epc) for construction of new line work between including earth work, blanketing, minor bridges, major bridges, robs, lhs/rubs, track works, platform work, station building, fobs, other buildings and associated miscellaneous civil engineering works for 25t indian railway standard loading from bikramshila (incl) to katareah (incl) from ch. 0.50 km to 24.274 km with shivnarayanpur to shivnarayanpur y-link from ch. km 1.10 to 2.933 km and katareah y-
Read moreEngineering procurement and construction (epc) for construction of doubling work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, track works, platform work, station building, fobs, other buildings, associated s&t and electrical utility shifting works and associated miscellaneous works for 25t indian railway standard loading from karnauti station(including-ch. 2.844 km) to bihar sharif station(excluding-ch 29.350 km), from ch. 1.900 km to 28.192 km (total- 2
Engineering procurement and construction (epc) for construction of doubling work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, track works, platform work, station building, fobs, other buildings, associated s&t and electrical utility shifting works and associated miscellaneous works for 25t indian railway standard loading from karnauti station(including-ch. 2.844 km) to bihar sharif station(excluding-ch 29.350 km), from ch. 1.900 km to 28.192 km (total- 2
Read moreConstruction of railway formation including blanketing material, side drain & other miscellaneous work for construction of full-length stabling lines by extending existing short-length track machine siding in tangarbansali station yard (tgb) under jurisdiction of sr den south of ranchi division.
Construction of railway formation including blanketing material, side drain & other miscellaneous work for construction of full-length stabling lines by extending existing short-length track machine siding in tangarbansali station yard (tgb) under jurisdiction of sr den south of ranchi division.
Read moreSouth central railway - construction organisation : secunderabad divison : secunderabad - wadi section : #sw1: execution of earth work in embankment & cutting, blanketing to rdso standards, construction of minor bridges & road under bridges (rubs), construction of station & service buildings, approach roads/circulating area, high level platforms, drains and execution of miscellaneous civil works in connection with new 3rd & 4th lines between hafizpet - sanathnagar stations from
South central railway - construction organisation : secunderabad divison : secunderabad - wadi section : #sw1: execution of earth work in embankment & cutting, blanketing to rdso standards, construction of minor bridges & road under bridges (rubs), construction of station & service buildings, approach roads/circulating area, high level platforms, drains and execution of miscellaneous civil works in connection with new 3rd & 4th lines between hafizpet - sanathnagar stations from
Read moreConstruction of 3rd line work including earthwork, blanketing, minor bridges, important bridges and other miscellaneous works for 25.0t of indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction and power supply in connection with the 3rd line work of madhukunda-damodar section in adra division of south eastern railway on engineering, procurement &
Construction of 3rd line work including earthwork, blanketing, minor bridges, important bridges and other miscellaneous works for 25.0t of indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction and power supply in connection with the 3rd line work of madhukunda-damodar section in adra division of south eastern railway on engineering, procurement &
Read moreConstruction of platforms, earthwork/ blanketing in formation/cutting, retaining wall & drain, rub, fob, minor bridge (br.no.466/2, 467/1, 467/2, 467/3, 467/4, 467/4, 468/1, 468/2, 469/1), station building(g+1) and station building compound wall, water tank, toilet, rub pump house, road, etc. work and dismantling and track works for nimbhora yard remodelling, including ballast supply in connection with bsl-knw 3rd and 4th line (131km) project of central railway. (two packet system).
Construction of platforms, earthwork/ blanketing in formation/cutting, retaining wall & drain, rub, fob, minor bridge (br.no.466/2, 467/1, 467/2, 467/3, 467/4, 467/4, 468/1, 468/2, 469/1), station building(g+1) and station building compound wall, water tank, toilet, rub pump house, road, etc. work and dismantling and track works for nimbhora yard remodelling, including ballast supply in connection with bsl-knw 3rd and 4th line (131km) project of central railway. (two packet system).
Read moreConstruction of 3rd line work including earthwork, blanketing, minor bridges, major bridges, lc work and other miscellaneous works for 25.0t and dfc feeder route of indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction and power supply in connection with the 3rd line work of chandil-madhukunda section in adra division of south eastern railway on eng
Construction of 3rd line work including earthwork, blanketing, minor bridges, major bridges, lc work and other miscellaneous works for 25.0t and dfc feeder route of indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction and power supply in connection with the 3rd line work of chandil-madhukunda section in adra division of south eastern railway on eng
Read moreof your Industry type