Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
1. Construction Of Navegoan Kh Dongariya Road Navegoan Kh To Awastoli Proposed Length 1.20 Km Part I 2.Construction Of Navegoan(kh) Dongariya Road Awastoli To Dongariya Proposed Length 1.47 Km Part Ii
|
| Description |
1. Construction Of Navegoan Kh Dongariya Road Navegoan Kh To Awastoli Proposed Length 1.20 Km Part I 2.Construction Of Navegoan(kh) Dongariya Road Awastoli To Dongariya Proposed Length 1.47 Km Part Ii
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_PWDRB_283688_1 |
|
Reference Number |
17-2/SAC/2023-24 BALAGHAT DATE 13/06/2023 |
| Tender Fee | 5000 |
| EMD | 50000 |
| Tender Value | - |
| Place | CHIEF ENGINEER (C.Z.) P.W.D. JABALPUR |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | June 14, 2023 23:00 |
| End Date |
Expired
03/07/2023
Expired 1203 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Strengthening of badera approach road length 1.20 and niwar railway station approach road length 0.50 km
Strengthening of badera approach road length 1.20 and niwar railway station approach road length 0.50 km
Read moreStrengthening works on semri approach road length 1.20 km, under sub division nagod.
Strengthening works on semri approach road length 1.20 km, under sub division nagod.
Read moreB.t. renewal work of kirangi to narmada river approach road length 1.20 km. and harratola to narmada river approach road length 1.60 km. total length 3.90 km. (1st call)
B.t. renewal work of kirangi to narmada river approach road length 1.20 km. and harratola to narmada river approach road length 1.60 km. total length 3.90 km. (1st call)
Read moreB.t. renewal work of barhari kudri to amhai deori road 1.20 km., batondha jamgaon road (ranidadar) to amol ashram road 2.80 km., lugdara-bhamiyantola ranidadar app. road 2.90 km. and jhilmila to pathariya road 2.10 km. total length 9.00 km. (3rd call
B.t. renewal work of barhari kudri to amhai deori road 1.20 km., batondha jamgaon road (ranidadar) to amol ashram road 2.80 km., lugdara-bhamiyantola ranidadar app. road 2.90 km. and jhilmila to pathariya road 2.10 km. total length 9.00 km. (3rd call
Read moreStrengthening of mofada khedi ahir bamhangaon road, total length 4.80 km. (proposed length 1.81 km.) under p.w.d. sub dn. seoni malwa. 3rd call, pac rs. 121.44 lacs on road bridge works sor 11.04.2025 (ammendment upto date), completion period 90 day
Strengthening of mofada khedi ahir bamhangaon road, total length 4.80 km. (proposed length 1.81 km.) under p.w.d. sub dn. seoni malwa. 3rd call, pac rs. 121.44 lacs on road bridge works sor 11.04.2025 (ammendment upto date), completion period 90 day
Read moreResurvey of yadehalli block-i proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 15.00 km in anandapura range, sagara division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Resurvey of yadehalli block-i proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 15.00 km in anandapura range, sagara division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Read moreResurvey of kodiyadibeliyuru block bit i & ii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 09.00 km in puttur range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Resurvey of kodiyadibeliyuru block bit i & ii proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 09.00 km in puttur range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Read moreResurvey of yedamangala rf extn block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 07.00 km in panja range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Resurvey of yedamangala rf extn block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 07.00 km in panja range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Read moreResurvey of parenky block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 12.50 km in belthangady range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Resurvey of parenky block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 12.50 km in belthangady range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Read moreResurvey of anaveri rf proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 6.80 km in shanthisagara range, bhadravathi division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Resurvey of anaveri rf proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 6.80 km in shanthisagara range, bhadravathi division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification proposed u/s 17 of kfa 1963.
Read moreof your Industry type