Tender Details

About Tender

🏭 Mtps I Mill Plant Unit I Overhaul Bid Invitation 🛠️ Tneb Limited, A State Government Undertaking, Is Seeking Bids For The Overhaul Of Hot Air Dampers, Cold Air Dampers, Cold Air Gates, Hot Air Gates, And Power Cylinders, Including The Renewal Of Hot Air Gate Seals, At Mettur Thermal Power Station I/Mettur Dam. 📅 Bid Submission Deadline: April 24, 2024, 2:00 Pm A Tender Fee Of Inr 4500 And An Earnest Money Deposit (Emd) Of Inr 2 Lakh Are Applicable. Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Pricing, And A Timeline For The Overhaul Process. Keywords: Mtps, I Mill Plant Unit I, Overhaul, Hot Air Dampers, Cold Air Dampers, Cold Air Gates, Hot Air Gates, Power Cylinder, Seal Renewal, Tneb Limited, State Government Undertaking, Tender, Bid, Mettur Dam
Particulars Details
Title
Mtps I Mill Plant Unit I Overhaul Of Hot Air Dampers Cold Air Dampers Cold Air Gates Hot Air Gate Power Cylinder Renewal Of Hot Air Gate Seal During Annual Overhaul 2024 25
Description
Mtps I Mill Plant Unit I Overhaul Of Hot Air Dampers Cold Air Dampers Cold Air Gates Hot Air Gate Power Cylinder Renewal Of Hot Air Gate Seal During Annual Overhaul 2024 25
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_428687_1
Reference
Number
CE / MTPS-I / SE / M-I / MP / OT.474/2023-24
Tender Fee 0
EMD 4500
Tender Value
Place Mettur Thermal Power Station-I / Mettur Dam
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=509709
Start Date February 21, 2024 23:30
End Date

24/04/2024 ( Expired 438 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ttps mech ii tm i unit iii overhauling of steam and condensate valves flange gasket renewal and machining of valves yoke bush in main turbine system during annual overhaul 2025 26

Ttps mech ii tm i unit iii overhauling of steam and condensate valves flange gasket renewal and machining of valves yoke bush in main turbine system during annual overhaul 2025 26

Read more
Ttps mech ii tm i unit iii inspection painting overhauling of condenser cw pipelines hotwells etc during annual overhaul 2025 26

Ttps mech ii tm i unit iii inspection painting overhauling of condenser cw pipelines hotwells etc during annual overhaul 2025 26

Read more
Ttps mech ii tm i unit iii inspection overhauling and commissioning of butterfly valve actuators for manual operation in condenser system during annual overhaul 2025 26

Ttps mech ii tm i unit iii inspection overhauling and commissioning of butterfly valve actuators for manual operation in condenser system during annual overhaul 2025 26

Read more
Ttps mech ii tm i unit iii overhauling of feed water tank deaerator vent condenser and overhauling of feed water valves steam condensate valves during annual overhaul 2025 26

Ttps mech ii tm i unit iii overhauling of feed water tank deaerator vent condenser and overhauling of feed water valves steam condensate valves during annual overhaul 2025 26

Read more
Ttps mech ii tm i unit iii overhauling of hpt ipt control valves and cam shaft assemblies etc during annual overhaul 2025 26

Ttps mech ii tm i unit iii overhauling of hpt ipt control valves and cam shaft assemblies etc during annual overhaul 2025 26

Read more
Ttps mech ii tm i unit iii renewel of piston seals piston rod packings in hp lp bypass valves and its spray valves actuators including servicing of oil filters during annual overhaul 2025 26

Ttps mech ii tm i unit iii renewel of piston seals piston rod packings in hp lp bypass valves and its spray valves actuators including servicing of oil filters during annual overhaul 2025 26

Read more
Ttps mech ii tm i unit iii condenser repairing and arresting the leak points in the longitudinal bellows and side walls of lpt exhaust hood during annual overhaul 2025 26

Ttps mech ii tm i unit iii condenser repairing and arresting the leak points in the longitudinal bellows and side walls of lpt exhaust hood during annual overhaul 2025 26

Read more
Ttps mech ii tm i unit iii overhauling of hp lp by pass valves and crh nrvs during annual overhaul 2025 26

Ttps mech ii tm i unit iii overhauling of hp lp by pass valves and crh nrvs during annual overhaul 2025 26

Read more
Ttps es circle instn i overhauling of 9 nos sample coolers painting and replacement of 6 nos half defective high pressure valves in sample lines of unit iii during the period of annual overhaul for the year of 2025 26

Ttps es circle instn i overhauling of 9 nos sample coolers painting and replacement of 6 nos half defective high pressure valves in sample lines of unit iii during the period of annual overhaul for the year of 2025 26

Read more
Ttps mech ii tm i unit iii inspection of governing elements checking h gap mop float renewal of mop bearings if necessary overhauling of cvsm pilot feed back pilot and intermediate pilot valves mop nrv etc during annual overhaul 2025 26

Ttps mech ii tm i unit iii inspection of governing elements checking h gap mop float renewal of mop bearings if necessary overhauling of cvsm pilot feed back pilot and intermediate pilot valves mop nrv etc during annual overhaul 2025 26

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise