Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Mtps I Mill Plant Unit Iii Overhaul Bid Invitation 🛠️ Tneb Limited, A State Government Undertaking, Is Seeking Bids For The Comprehensive Overhaul Of Various Components Within The Mtps I Mill Plant Unit Iii. This Includes The Maintenance And Renewal Of Hot Air Dampers, Cold Air Dampers, Cold Air Gates, Hot Air Gates, Power Cylinders, And Gate Seals. The Overhaul Is Scheduled To Take Place During The Annual Overhaul 2024 25. 📅 Bid Submission Deadline: April 17, 2024, 2:00 Pm Tender Fee: Inr 0 Emd: Inr 4000 Interested Bidders Must Possess The Necessary Technical Expertise And Experience In Handling Such Overhaul Projects Within Thermal Power Stations. Detailed Proposals, Including Methodology, Pricing, And Timelines, Are To Be Submitted To Ensure Compliance With The Project Specifications And Safety Standards. Keywords: Mtps, I Mill Plant, Unit Iii, Overhaul, Hot Air Dampers, Cold Air Dampers, Cold Air Gates, Hot Air Gates, Power Cylinder, Gate Seal, Tneb Limited, State Government Undertaking, Renewal, Thermal Power Station, Annual Overhaul, Bid Invitation| Particulars | Details |
|---|---|
| Title |
Mtps I Mill Plant Unit Iii Overhaul Of Hot Air Dampers Cold Air Dampers Cold Air Gates Hot Air Gate Power Cylinder Renewal Of Hot Air Gate Seal During Annual Over Haul 2024 25
|
| Description |
Mtps I Mill Plant Unit Iii Overhaul Of Hot Air Dampers Cold Air Dampers Cold Air Gates Hot Air Gate Power Cylinder Renewal Of Hot Air Gate Seal During Annual Over Haul 2024 25
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_424063_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / MP/OT. 428/ 2023-24 |
| Tender Fee | 0 |
| EMD | 4000 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=504125 |
| Start Date | February 13, 2024 18:30 |
| End Date |
Expired
17/04/2024
Expired 912 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of spares of coal mill hot air dampers and cold air dampers installed in phase-i at 2x600mw at sstpp, mppgcl, dongalia
Procurement of spares of coal mill hot air dampers and cold air dampers installed in phase-i at 2x600mw at sstpp, mppgcl, dongalia
Read moreMtps i mill plant unit ii overhauling of tramp iron chute knife edge gate valves strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills renewal of the worn out mill
Mtps i mill plant unit ii overhauling of tramp iron chute knife edge gate valves strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills renewal of the worn out mill
Read moreMtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Read moreMtps i mill plant unit iii complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 3a 3b 3c 3f tilting work
Mtps i mill plant unit iii complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 3a 3b 3c 3f tilting work
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Read moreTtps operation circle mpm ii unit v overhauling of gravimetric feeder, bunker gates, hag, cag, had, cad and painting of cold air duct and feeder during the forthcoming annual overhaul
Ttps operation circle mpm ii unit v overhauling of gravimetric feeder, bunker gates, hag, cag, had, cad and painting of cold air duct and feeder during the forthcoming annual overhaul
Read moreTtps operation circle mpm ii unit iv overhauling of gravimetric feeder bunker gates hag cag had cad and painting of cold air duct and feeder during the forthcoming annual overhaul
Ttps operation circle mpm ii unit iv overhauling of gravimetric feeder bunker gates hag cag had cad and painting of cold air duct and feeder during the forthcoming annual overhaul
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Read moreMtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Mtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Read moreCopper alloy gate valve for waterworks purpose (v2) conforming to is 778,copper alloy gate valve for waterworks purpose (v2) conforming to is 778,sluice valve for water works purposes (50 to 1200 mm size) (v2) as per is 14846,plastic bib taps, pillar taps, angle valves & stop valves for hot & cold water services conforming to is 9763,copper alloy taps/stop valves (v2) conforming to is 8931,copper alloy taps/stop valves (v2) conforming to is 8931,bathroom water shower (v2),towel rail
Copper alloy gate valve for waterworks purpose (v2) conforming to is 778,copper alloy gate valve for waterworks purpose (v2) conforming to is 778,sluice valve for water works purposes (50 to 1200 mm size) (v2) as per is 14846,plastic bib taps, pillar taps, angle valves & stop valves for hot & cold water services conforming to is 9763,copper alloy taps/stop valves (v2) conforming to is 8931,copper alloy taps/stop valves (v2) conforming to is 8931,bathroom water shower (v2),towel rail
Read moreof your Industry type