Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Pit Less Type Weigh Bridge Foundation Along With Approach And Peripheral Road And Weigh Bridge Office Building At Gumgaon Mine.
|
| Description |
Construction Of Pit Less Type Weigh Bridge Foundation Along With Approach And Peripheral Road And Weigh Bridge Office Building At Gumgaon Mine.
|
| Organisation | MOIL Limited | Central Govt. Ministry/Department |
| Tender Id | 2024_MOIL_745487_1 |
|
Reference Number |
MOIL/MOIL LIMITED/CMC/23-24/ET/109 |
| Tender Fee | 0 |
| EMD | 25000 |
| Tender Value | - |
| Place | Gumgaon Mine |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1048620 |
| Start Date | February 29, 2024 20:30 |
| End Date |
Expired
15/03/2024
Expired 945 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Comprehensive annual maintenance contract of 04 nos. of pit less road weigh bridges at bhanora west block colliery, ssi colliery, satgram project and nimcha colliery under satgram sripur area.
Comprehensive annual maintenance contract of 04 nos. of pit less road weigh bridges at bhanora west block colliery, ssi colliery, satgram project and nimcha colliery under satgram sripur area.
Read moreConstruction of 100 mtr span double lane motarable bridge along with approach road over mandi river at chakrara block sathra district poonch
Construction of 100 mtr span double lane motarable bridge along with approach road over mandi river at chakrara block sathra district poonch
Read moreConstruction of an rcc bridge span 1x5x3.50 meters along with approach roads and an additional approach road opposite subhash chandra shukla field on the rajwaha distributary of the dabhasemar and abanpur canals in karpuri thakur ward masodha
Construction of an rcc bridge span 1x5x3.50 meters along with approach roads and an additional approach road opposite subhash chandra shukla field on the rajwaha distributary of the dabhasemar and abanpur canals in karpuri thakur ward masodha
Read moreConstruction of a bridge with a 2m x 3m x 3m span, along with approach roads and an additional approach road, over the joriya nala at the nariyavan-modra border in pura bazar development block, ayodhya district.
Construction of a bridge with a 2m x 3m x 3m span, along with approach roads and an additional approach road, over the joriya nala at the nariyavan-modra border in pura bazar development block, ayodhya district.
Read moreConstruction of rcc foot bridge (small bridge for movement of four wheeler and pedestrian along with bothside approach road) at subharam chowdhury para under sreeramkhara adc village under mungiakami rd block, khowai district (as per pwd sor 2023).
Construction of rcc foot bridge (small bridge for movement of four wheeler and pedestrian along with bothside approach road) at subharam chowdhury para under sreeramkhara adc village under mungiakami rd block, khowai district (as per pwd sor 2023).
Read moreDismantling of 6 no. damaged pole and re-erection of 6 no. pole and erection 550 mtrs cradle guard in the 3 wire 550v overhead line from 5 pit sub-station to jeenagora weigh bridge of amal. joyrampur colliery under lodna area..
Dismantling of 6 no. damaged pole and re-erection of 6 no. pole and erection 550 mtrs cradle guard in the 3 wire 550v overhead line from 5 pit sub-station to jeenagora weigh bridge of amal. joyrampur colliery under lodna area..
Read moreConstruction of 2 x 4 x 4 meter span box culvert along with approach roads and protective works to replace the damaged minor bridge at the 2nd kilometer of the belahi-udhopur village connecting road in district deoria
Construction of 2 x 4 x 4 meter span box culvert along with approach roads and protective works to replace the damaged minor bridge at the 2nd kilometer of the belahi-udhopur village connecting road in district deoria
Read moreConstruction of balance work of 165.00 mtr span double lane bridge on nahan dadahu haripurdhar road at rd 35/690.(sh c/o of approach road along with m/t) under crf (job no. crf-hp-2018-19-155)
Construction of balance work of 165.00 mtr span double lane bridge on nahan dadahu haripurdhar road at rd 35/690.(sh c/o of approach road along with m/t) under crf (job no. crf-hp-2018-19-155)
Read moreConstruction of 2 x 3 x 3 span box culvert along with approach roads and protective works to replace the damaged minor bridge over the kirhi nala at the 1st kilometer of the belahi-udhopur village connecting road in district deoria
Construction of 2 x 3 x 3 span box culvert along with approach roads and protective works to replace the damaged minor bridge over the kirhi nala at the 1st kilometer of the belahi-udhopur village connecting road in district deoria
Read moreof your Industry type