Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Shifting Of 11 Kv And Lt Line At Changsari Nathgaon From Nh 27 To Changsari Sesa Road Via Nath Gaon Due To Road Widening And Construction Of A New Drainage System Under Sopd G For The Year 2024 25
|
| Description |
Shifting Of 11 Kv And Lt Line At Changsari Nathgaon From Nh 27 To Changsari Sesa Road Via Nath Gaon Due To Road Widening And Construction Of A New Drainage System Under Sopd G For The Year 2024 25
|
| Organisation | Public Works Roads Department | State Govt. and UT |
| Tender Id | 2024_PWD_41759_1 |
|
Reference Number |
CS/JTRD/SOPD(G)/68/2024-25 |
| Tender Fee | 900 |
| EMD | 81000 |
| Tender Value | - |
| Place | Changsari |
| Link |
View Original Tender Notice
https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=67209 |
| Start Date | January 08, 2025 19:30 |
| End Date |
Expired
16/01/2025
Expired 640 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
For the shifting work of existing 11 kv lt line and transformer due to widening of road from dangipar to bhagalpur via jungle ayodya prasad distt gorakhpur
For the shifting work of existing 11 kv lt line and transformer due to widening of road from dangipar to bhagalpur via jungle ayodya prasad distt gorakhpur
Read moreFor the shifting work of existing 33 kv 11 kv lt line and transformer due to widening of shivpur to belwar via dari jungle and kewatliya tola distt gorakhpur
For the shifting work of existing 33 kv 11 kv lt line and transformer due to widening of shivpur to belwar via dari jungle and kewatliya tola distt gorakhpur
Read moreShifting of raw water rising mains from badi talab to pichhola due to widening of road between rampura circle and ubeshvar ji tiraha under uwss udaipur including twelve months defect liability period on single point responsibility basis.
Shifting of raw water rising mains from badi talab to pichhola due to widening of road between rampura circle and ubeshvar ji tiraha under uwss udaipur including twelve months defect liability period on single point responsibility basis.
Read moreShifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis
Shifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis
Read moreProposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis
Proposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis
Read moreSopd_g_23_24_72 construction of rcc drain cum footpath at changsari nathgaon road including byelane under sopd-g for the year 2023-24
Sopd_g_23_24_72 construction of rcc drain cum footpath at changsari nathgaon road including byelane under sopd-g for the year 2023-24&#x0d
Read moreShifting of distribution system and installation of fhtc damage due to widening of pwd road at siporia batabari pwss under sopd-g for the year 2025-26
Shifting of distribution system and installation of fhtc damage due to widening of pwd road at siporia batabari pwss under sopd-g for the year 2025-26
Read moreShifting of distribution system and installation of fhtc damage due to widening of pwd road at niz garubandha pwss under sopd-g for the year 2025-26
Shifting of distribution system and installation of fhtc damage due to widening of pwd road at niz garubandha pwss under sopd-g for the year 2025-26
Read moreConstruction of new compound wall due to nh 40 formerly nh 4 widening project at bhel ranipet
Construction of new compound wall due to nh 40 formerly nh 4 widening project at bhel ranipet
Read moreShifting of 66 kv network due to widening of existing road from intermediate 2 lane to 4 lane of nh-848a (rakholi-khadoli-velugam).
Shifting of 66 kv network due to widening of existing road from intermediate 2 lane to 4 lane of nh-848a (rakholi-khadoli-velugam).
Read moreof your Industry type