Tender Details

Particulars Details
Title
Operation And Maintenance (3 Years) Of Stp And Lawn For Kasan Lake In Ward 9 Under The Jurisdiction Of Municipal Corporation Manesar. Retender
Description
Operation And Maintenance (3 Years) Of Stp And Lawn For Kasan Lake In Ward 9 Under The Jurisdiction Of Municipal Corporation Manesar. Retender
Organisation Haryana Government | State Govt. and UT
Tender Id 2025_HRY_483649_1
Reference
Number
2025216A2C03 BF51 4B6F A115 FA99DFA2D4791809ULB
Tender Fee 6180
EMD 96868
Tender Value -
Place Manesar
Link
View Original Tender Notice

https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=561653

Start Date November 17, 2025 17:30
End Date
Expired 25/11/2025

Expired 322 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Operation and maintenance of borewells and 25 hp pump etc. at ward no 8, under div-ii municipal corporation manesar- retender

Operation and maintenance of borewells and 25 hp pump etc. at ward no 8, under div-ii municipal corporation manesar- retender

Read more
Operation and maintenance (o and m) of 2.50 mld stp-ii at brundaban colony for two years(2027-29).

Operation and maintenance (o and m) of 2.50 mld stp-ii at brundaban colony for two years(2027-29).

Read more
Hiring of truck mounted anti-smog guns along with operation and maintenance for a period of 35 days in the jurisdiction of municipal corporation manesar.

Hiring of truck mounted anti-smog guns along with operation and maintenance for a period of 35 days in the jurisdiction of municipal corporation manesar.

Read more
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years

Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years

Read more
Design, construction, supply, installation, testing and commissioning of 5.2 mld stp based on sbr with tertiary treatment and providing sewer network in belgaria township including 5 years operation and maintenance (2 years dlp)

Design, construction, supply, installation, testing and commissioning of 5.2 mld stp based on sbr with tertiary treatment and providing sewer network in belgaria township including 5 years operation and maintenance (2 years dlp)

Read more
Construction of treated sewage pumping station, drain outfall for disposal of treated sewage from 9 mld stp and o&m of above work for 15 years at naugachiya.

Construction of treated sewage pumping station, drain outfall for disposal of treated sewage from 9 mld stp and o&m of above work for 15 years at naugachiya.

Read more
Operation and maintenance of the truck terminal in osr no.8, 9 and 13 at sipcot industrial park sriperumbudur for a period of 36 months (three years) (per year rate)

Operation and maintenance of the truck terminal in osr no.8, 9 and 13 at sipcot industrial park sriperumbudur for a period of 36 months (three years) (per year rate)

Read more
Work of augmentation of existing sewerage network in the periphery area of pichola and fatehsagar lake and the work of operation and maintenance for duration of 10 years of augmented network and the existing sewerage network in the per

Work of augmentation of existing sewerage network in the periphery area of pichola and fatehsagar lake and the work of operation and maintenance for duration of 10 years of augmented network and the existing sewerage network in the per

Read more
Firewall,logging and analytics,storage,core switch,distribution switch main,sfp 10g,sfp 25g,qsfp 40g,distribution switch h hostel,access switch poe,wi-fi 7 access point,wlan controller,sfp 10g,qsfp 40g,utp patch cord 0.5 mtr,utp patch cord 2 mtr,io face plate,patch panel,cat 6 utp cable,fiber cable,25 mm pvc casing capping conduit,rack 12u,rack 9 u,liu 6 port,liu 24 port,fiber patch cord,ups,network management and monitoring,50x50 mm pvc trunking,laying of utp cable,io face plate,ofc cable laying,cat6 patch panel installation,fiber splicing,rack installation and dressing,access point installation charges,network device installation testing and commissioning,01 manpower for service and support 3 years,03 year support, operation and maintenance

Firewall,logging and analytics,storage,core switch,distribution switch main,sfp 10g,sfp 25g,qsfp 40g,distribution switch h hostel,access switch poe,wi-fi 7 access point,wlan controller,sfp 10g,qsfp 40g,utp patch cord 0.5 mtr,utp patch cord 2 mtr,io face plate,patch panel,cat 6 utp cable,fiber cable,25 mm pvc casing capping conduit,rack 12u,rack 9 u,liu 6 port,liu 24 port,fiber patch cord,ups,network management and monitoring,50x50 mm pvc trunking,laying of utp cable,io face plate,ofc cable laying,cat6 patch panel installation,fiber splicing,rack installation and dressing,access point installation charges,network device installation testing and commissioning,01 manpower for service and support 3 years,03 year support, operation and maintenance

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise