Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Detailed Investigation And Preparation Of Dpr For Expansion And Extension Of Road From Moidu Bridge To Muzhappilangad Beach Investigation Work
|
| Description |
General Detailed Investigation And Preparation Of Dpr For Expansion And Extension Of Road From Moidu Bridge To Muzhappilangad Beach Investigation Work
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2025_PWD_819138_2 |
|
Reference Number |
PWD/RB/TR/14726/2025_3_1_1/1 |
| Tender Fee | 2760 |
| EMD | 31762 |
| Tender Value | - |
| Place | kannur |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1373098 |
| Start Date | November 05, 2025 19:30 |
| End Date |
Expired
10/11/2025
Expired 298 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Re-advertisement for request for proposal for consultancy services for preparation of detailed project report (dpr) and transaction advisor (ta) for buxar – bhagalpur six-lane greenfield access-controlled expressway
Re-advertisement for request for proposal for consultancy services for preparation of detailed project report (dpr) and transaction advisor (ta) for buxar – bhagalpur six-lane greenfield access-controlled expressway
Read moreProviding consultancy services for preparation of detailed project report (dpr) for the formation of new industrial areas including economic analysis, surveying, layout plan design, preparation of cost estimates, cost structure etc., for the proposed mulwada 4th & 5th phase industrial area, belagavi district. (extent 487acres 39 guntas).
Providing consultancy services for preparation of detailed project report (dpr) for the formation of new industrial areas including economic analysis, surveying, layout plan design, preparation of cost estimates, cost structure etc., for the proposed mulwada 4th & 5th phase industrial area, belagavi district. (extent 487acres 39 guntas).
Read moreSoil investigation for preparation of dpr
Soil investigation for preparation of dpr for proposed construction of two storied new office building of b.l. and l.r.o., kalyani with provision of four storied foundation at kalyani, nadia
Read moreSurvey investigation and preparation of dpr
Nit schedule for construction of new road survey investigation and preparation of dpr under pwd (b/r) division umaria
Read morePreparation of detailed project report (dpr)
Preparation of detailed project report (dpr) for introducing mass rapid transit system
 between poonamalle and parandur as part of chennai metro rail limited network
Read morePreparation of dpr for bridge
Preparation of detailed project report dpr for the work of construction of new bridge over river mahananda with both side approaches besides us or ds the existing bridge about 485.00 m at existing ah02 chainage 30.00th km new nh10
Read moreGeneral-load test for the existing moidu bridge-in kannur district-investigation work
General-load test for the existing moidu bridge-in kannur district-investigation work
Read moreKiifb-dpr preparation of thottasseriyara- illathumadu road in vallikunnu lac in malappuram district- detailed investigation works
Topographic survey, traffic survey, inventory, pavement composition, soil collection and testing, subsoil investigation etc
Read moreConsultancy services for survey investigation and preparation of detailed project report (dpr) for jaisalmer ring road
Consultancy services for survey investigation and preparation of detailed project report (dpr) for jaisalmer ring road
Read moreof your Industry type