Tender Details

Particulars Details
Title
Construction Of Entry Gate And Upgradation Of Ghat At Ballaleshwar Temple And Rameshwar Temple At Panvel. (2nd Call)
Description
As Per Tender
Organisation Panvel Municipal Corporation | State Govt. and UT
Tender Id 2024_PMC_1027628_1
Reference
Number
PMC/CE/250/2023-24
Tender Fee 1180
EMD 1.46 Lakh
Tender Value
Place PMC Area
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1796734
Start Date March 06, 2024 20:30
End Date

13/03/2024 ( Expired 436 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Selection of epc contractor for integrated manufacturing cluster imc palakkad

Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.

Read more
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis

Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis

Read more
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)

Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)

Read more
Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)

Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)

Read more
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat

Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat

Read more
Construction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode

Construction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode

Read more
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Read more
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Read more
6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call

6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise