Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: Air Filters For Lhb Ac Coaches 🌬️🚆 The Ministry Of Railways, Specifically Targeting Suppliers Capable Of Providing High Quality Air Filters, Invites Bids For The Procurement Of Fresh Air Filters. The Filters Must Comply With The Specifications Outlined In Rdso Drg No. Rdso/Pe/Sk/Ac/0074 2004 (Rev 1) And Rdso Spec. No. Rdso/Pe/Spec/Ac/0055 2003, Rev 2. 📅 Bid Submission Deadline: July 23, 2024, 11:00 Am A Earnest Money Deposit (Emd) Of Inr 10810 Is Required For Submission. Interested Suppliers Should Meticulously Review The Tender Documents For Complete Details And Submit Their Bids Accordingly. Keywords: Air Filters, Lhb Ac Coaches, Ministry Of Railways, Rdso Specifications, Government Tender, Procurement, Emd| Particulars | Details |
|---|---|
| Title |
Coach Set Of Stainless Steel Roof And Side Wall For Emu
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106312566 |
|
Reference Number |
02241789 |
| Tender Fee | 0 |
| EMD | 17.7 Lakh |
| Tender Value | - |
| Place | Chennai |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/102024/106474235/viewNitPdf_4719557.pdf |
| Start Date | September 18, 2024 23:27 |
| End Date |
Expired
29/10/2024
Expired 718 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Stainless steel fixing dustbin under outside wash basin for lhb coach.
Stainless steel fixing dustbin under outside wash basin for lhb coach.
Read moreStainless steel wash basin outside and dustbin fixing arrangement for lhb coach.
Stainless steel wash basin outside and dustbin fixing arrangement for lhb coach.
Read moreOne coach set of stainless steel floor skirting for lhb eog coaches
One coach set of stainless steel floor skirting for lhb eog coaches
Read moreOne coach set of roof complete, side wall assembly, lavatory side wall complete, end wall complete and final roof element assembly for lwcbac amrit bharat coach (without primer).
One coach set of roof complete, side wall assembly, lavatory side wall complete, end wall complete and final roof element assembly for lwcbac amrit bharat coach (without primer).
Read moreFoot step arrangement for 3-phase emu tc [foot step arrangement for 3-phase emu tc coach as per drg no. dmu/dpc6/ss-2-4-002 alt b col i.]
Foot step arrangement for 3-phase emu tc [foot step arrangement for 3-phase emu tc coach as per drg no. dmu/dpc6/ss-2-4-002 alt b col i.]
Read moreStainless steel wash basin complete with platform (lh) inside for lhb coach to drawing/specification rcf drg.no.mi004544, alt.e , material & specification as per drawing
Stainless steel wash basin complete with platform (lh) inside for lhb coach to drawing/specification rcf drg.no.mi004544, alt.e , material & specification as per drawing
Read moreof your Industry type