Tender Details
Particulars | Details |
---|---|
Title |
For The C/ O Rcc Water Storage Tank At Chalei In Gp Kuthed Under Apo Chamba During 2023 24
|
Description |
For The C/ O Rcc Water Storage Tank At Chalei In Gp Kuthed Under Apo Chamba During 2023 24
|
Organisation | Chief Project Director IDP Solan | State Govt. and UT |
Tender Id | 2024_CPD1_83917_1 |
Reference Number |
TENDER / WORKS / 258 / 2023-24 |
Tender Fee | 500 |
EMD | 25000 |
Tender Value | |
Place | Village Chalei |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=124639 |
Start Date | January 11, 2024 22:00 |
End Date |
24/01/2024 ( Expired 503 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConstruction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreConstruction of rcc ramp cum road along with rcc retaining wall for unloading of ld oil from tankers near hfo / ldo storage pump house at atps, mppgcl, chachai.
Construction of rcc ramp cum road along with rcc retaining wall for unloading of ld oil from tankers near hfo / ldo storage pump house at atps, mppgcl, chachai.
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreBalance job for revival of integrated ash water recovery system of ahp at unit#6 under capex 2023-2024 at stps.
Balance job for revival of integrated ash water recovery system of ahp at unit#6 under capex 2023-2024 at stps.
Read moreRepair to sewage line and cleaning of manhole, septic tank and allied b/r work in zone iv, repair and replacment of unserviceable water tanks, roof treatment and allied services of zone iii and iv at umroi mil stn under ge umroi
Repair to sewage line and cleaning of manhole, septic tank and allied b/r work in zone iv, repair and replacment of unserviceable water tanks, roof treatment and allied services of zone iii and iv at umroi mil stn under ge umroi
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at barakar health centre zone-24 kulti under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at barakar health centre zone-24 kulti under amrut&#x0d 2.0 phase-iii within amc
Read moreSs of s/bldr,s/agg v/sizes and c/sand for pmt and gsb wks at km 34.50 on rrk rd and for wmm at km 22.70 (wmm plant site) on rrk rd and for dbm and bc km 76.00 on rrk (hmp site) for approach wks of quikhola bridge udr 130 rcc/ 764 brtf / swtk in sikki
Ss of s/bldr,s/agg v/sizes and c/sand for pmt and gsb wks at km 34.50 on rrk rd and for wmm at km 22.70 (wmm plant site) on rrk rd and for dbm and bc km 76.00 on rrk (hmp site) for approach wks of quikhola bridge udr 130 rcc/ 764 brtf / swtk in sikki
Read moreof your Industry type