Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Road Over Bridge (1x24m Span Composite Girder) At Km.59/700 800 For Elimination Of Lc No.55 Between Akk Mgf Station And Lc No.68 At Km. 74/00 100 Between Mgf Hln Station Conducting Of Dgps Survey, Preparation Of Soil Investigation Report &Amp Gad.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 73025079 |
|
Reference Number |
MYS-ASK-LC55-68 |
| Tender Fee | 0 |
| EMD | 53100 |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/032024/73025079/viewNitPdf_4450370.pdf |
| Start Date | February 13, 2024 19:07 |
| End Date |
Expired
06/03/2024
Expired 956 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Gandhidham - new bhuj - naliya section - ohe modification work in connection to lc elimination and bridge rebuilding & girder replacement work
Gandhidham - new bhuj - naliya section - ohe modification work in connection to lc elimination and bridge rebuilding & girder replacement work
Read moreProposed construction of rob for elimination of manned lc at lc no. 554 at km 1098/33-35 between chcr (chacher)-sal(salwa) block section.
Proposed construction of rob for elimination of manned lc at lc no. 554 at km 1098/33-35 between chcr (chacher)-sal(salwa) block section.
Read moreSub work 2- elimination of level crossings gates-lc nos.234 235 & 236 by constructing road under bridges between chinnaganjam - vetapalem stations by air pushing method with rh girder in vijayawada - gudur section of vijayawada division under south central railway, andhra pradesh, india
Sub work 2- elimination of level crossings gates-lc nos.234 235 & 236 by constructing road under bridges between chinnaganjam - vetapalem stations by air pushing method with rh girder in vijayawada - gudur section of vijayawada division under south central railway, andhra pradesh, india
Read moreSub work 1: elimination of level crossings gates-lc nos.201, 202 & 204 by constructing road under bridges between surareddipelam - ongole stations by air pushing method with rh girder in vijayawada - gudur section of vijayawada division under south central railway, andhra pradesh, india
Sub work 1: elimination of level crossings gates-lc nos.201, 202 & 204 by constructing road under bridges between surareddipelam - ongole stations by air pushing method with rh girder in vijayawada - gudur section of vijayawada division under south central railway, andhra pradesh, india
Read moreHyb division: sc-mue section: construction of road under bridge in lieu of lc no. 255 at km 616/700-800 between cavalry barracks & malkajgiri station by air pushing method with rh girder.
Hyb division: sc-mue section: construction of road under bridge in lieu of lc no. 255 at km 616/700-800 between cavalry barracks & malkajgiri station by air pushing method with rh girder.
Read moreConstruction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read more1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:
1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:
Read more1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.
1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.
Read moreTrd work against various engg works over firozpur division in c/w (i)- elimination of manned l-xing no. s-63 at km 433/27-28 by providing limited height subway of internal size 5m x 5m on juc-bes section (between juc-srx) by pushing method in the section under aden/juc (ii)- provision of 3.00m wide covered light weight rob near lc no. s-3 on ldh-dui section under aden/ldh, (iii)- construction of 5m x 3.5m lhs in lieu of closed level crossing no. c-7 on juc-nro section by pushing method under a
Trd work against various engg works over firozpur division in c/w (i)- elimination of manned l-xing no. s-63 at km 433/27-28 by providing limited height subway of internal size 5m x 5m on juc-bes section (between juc-srx) by pushing method in the section under aden/juc (ii)- provision of 3.00m wide covered light weight rob near lc no. s-3 on ldh-dui section under aden/ldh, (iii)- construction of 5m x 3.5m lhs in lieu of closed level crossing no. c-7 on juc-nro section by pushing method under a
Read moreof your Industry type