Tender Details
Particulars | Details |
---|---|
Title |
Imp Esti For Strengthing Of Existing 7 3 35 Into 7 4 09 In Location Of Kadiapattinamunder Manavalakurichy Section Eraniel C And I Section In Thuckalay Division
|
Description |
Imp Esti For Strengthing Of Existing 7 3 35 Into 7 4 09 In Location Of Kadiapattinamunder Manavalakurichy Section Eraniel C And I Section In Thuckalay Division
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 2440 |
Tender Value | |
Place | o/o EE/D/TKY |
Link |
AAAAAAAAAA Login to view |
Start Date | May 15, 2025 19:30 |
End Date |
28/05/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreCs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat
Cs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat
Read moreConsultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Consultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Read moreConsultancy services for preparation of dpr of for upgradation of 4-lane stretches of barwa adda to panagarh section of nh 19 into 6 lane standard in the state of jharkhand and west bengal
Consultancy services for preparation of dpr of for upgradation of 4-lane stretches of barwa adda to panagarh section of nh 19 into 6 lane standard in the state of jharkhand and west bengal
Read moreConstruction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.
Construction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.
Read moreConducting subsoil investigation for proposed construction of robs in lieu of existing level crossings in kerala state for 7 robs in ernakulam - kottayam- kayamkulam, shoranur- ernakulam and shoranur- nilambur sections
Conducting subsoil investigation for proposed construction of robs in lieu of existing level crossings in kerala state for 7 robs in ernakulam - kottayam- kayamkulam, shoranur- ernakulam and shoranur- nilambur sections
Read moreConducting subsoil investigation for proposed construction of robs in lieu of existing level crossings in kerala state for 7 robs in ernakulam - alappuzha- kayamkulam, kayamkulam- kollam, kollam- thenkasi and thiruvananthapuram - nagercoil sections
Conducting subsoil investigation for proposed construction of robs in lieu of existing level crossings in kerala state for 7 robs in ernakulam - alappuzha- kayamkulam, kayamkulam- kollam, kollam- thenkasi and thiruvananthapuram - nagercoil sections
Read moreWork of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Read moreRfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.
Rfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.
Read moreRfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Rfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Read moreof your Industry type