Tender Details
About Tender
🚇 Construction Opportunity: Limited Height Subway (Lhs) For Indian Railways 🛠️🏗️ The Ministry Of Railways, Central Government, Invites Tenders For The Construction Of A Limited Height Subway (Lhs) At Vyasacolony Swamihalli (Vc Smli) Section, Hubballi Division, In Lieu Of Lc No.10, Between Km 29/200 300, As Part Of The Yeshvanthnagar Swamihalli (Ytg Smli) Station. 📅 Bid Submission Deadline: July 01, 2024, 11:00 Am Earnest Money Deposit (Emd): Inr 5,87,600 Interested Contractors Must Submit Detailed Tenders, Including All Necessary Technical And Financial Details, Adhering To The Specifications Outlined In The Tender Document. The Project Includes A Maintenance Period Of 6 Months. Keywords: Construction, Limited Height Subway, Indian Railways, Ministry Of Railways, Tender, Infrastructure Project, Hubballi, Civil Works, Emd, Bid SubmissionParticulars | Details |
---|---|
Title |
Hubballi Division: Vyasacolony Swamihalli (Vc Smli) Section: Construction Of Limited Height Subway(lhs) In Lieu Of Lc No.10, Km 29/200 300 In Between Yeshvanthnagar Swamihalli (Ytg Smli) Station Respectively By Rh Girder/Cut And Cover Method. (Maintenance Period=06 Months)
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 75393740 |
Reference Number |
10UBL24-25DT050624ITEM-01 |
Tender Fee | 0 |
EMD | 5.88 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75393740/viewNitPdf_4587925.pdf |
Start Date | June 06, 2024 00:02 |
End Date |
01/07/2024 ( Expired 294 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreConstruction of complete rob & limited height subway in lieu of lc 4 (railway portion except steel girder approach road in state portion) at km 60/23-25 in indara yard, lc 67c (railway portion including steel girder approach road in state portion) at km 95/273 between kkt-pou section & lc 115 (only railway portion including bow string girder) at km 433/723 in btt yard of varanasi division in n. e. railway
For complete deion and other details, please refer to tender
Read moreHubballi division- hubballi-ballari section: 1) construction of subway at km 117/000-100 in lieu of lc no.66 at km.117/600-700 between koppal and ginigera stations (balance works). 2) construction of subway in lieu of lc no.62 at km 116/100-200 between koppal and ginigera stations (balance works)
For complete deion and other details, please refer to tender
Read moreHubballi division:gadag-hotgi( gdg-hg) section: construction of limited height subway in lieu of lc no.110 km 243/7-8 in between indi road - lahyan (idr-lhn) station respectively by box pushing method.
For complete deion and other details, please refer to tender
Read moreElectrical work for construction of restricted height subway for trespasser in lieu of closed lc at prr yard near shankar chitralaya by cut & cover method, (b) construction of rub/subway for elimination of manned level crossings 1 no. for jc-52 between cni-prr section, (c) construction of rub/subway for elimination of manned level crossings bg-20 between tle-mhq & bg-26 between mhq-knf section by cut & cover method in adra division of s.e.railway.
For complete deion and other details, please refer to tender
Read moreHubballi division: badami-hotgi (bdm-hg): improvement to lhs no.96 at km 218/500-600 between minchana-nimbal (mnl-nbl) station by construction of retaining wall and height guage for lc-nos:92,96 and 98 in aden/bjp sub division. (maintenance period=06 months)
For complete deion and other details, please refer to tender
Read moreHubballi division: badami-hotgi (bdm-hg): improvement to lhs no.88 (br no. 79-b) at km 203/300-400 between aliyabad-minchanal (ayb mnl) stations and retaining wall, approach road and height guage in aden/bjp sub division. (maintenance period=06 months)
For complete deion and other details, please refer to tender
Read moreHubballi division-alnawar-londa (lwr-ld) section: rebuilding of br.no.133 dn, 140 dn & 144 dn on ac of orn 3 with precast rcc segmental boxes by rh girder/cut and cover method in alnawar-tavargatti (lwr-tvg) section. (maintenance period=12 months)
For complete deion and other details, please refer to tender
Read moreConstruction of 2 lane rob in lieu of lc no .39 at km 66/200-300 with 1x42m bowstring girder (railway portion) 08x18.71m psc girder towards nh-73 baddihalli side and 17x18.71m psc girder towards nh-43 side and retaining wall on both sides of rob merging lengths between kyathasandra and tumakur stations and proposed construction of lhs in lieu of lc 39 at km 66/200-300 as 1x5.5x2.5m rcc box including electrical works (composite work)
For complete deion and other details, please refer to tender
Read moreKhandwa-itarsi section - construction of limited height subway in lieu of level crossing no. 205 at km. 671/20-22 (non-interlocked engineering gate) as 1/5.00 x 4.50 m rcc box with using rh girder (cut and cover method)
For complete deion and other details, please refer to tender
Read moreof your Industry type