Tender Details
About Tender
π Construction Opportunity: Limited Height Subway At Hubballi Division π οΈπ§ The Ministry Of Railways, Central Government, Invites Tenders For The Construction Of A Limited Height Subway In Lieu Of Lc No.37 At Km 67/000 100, Between Kgx Rlp Station, Utilizing The Rh Girder/Cut And Cover Method. ποΈ π Submission Deadline: April 05, 2024, 11:00 Am The Tender Fee Is Inr 0, With An Earnest Money Deposit (Emd) Of Inr 4,45,500. π° Interested Contractors Must Review The Complete Tender Document For Detailed Specifications, Project Scope, And Submission Guidelines. π Keywords: Construction, Subway, Railway, Ministry Of Railways, Infrastructure, Tender, Hubballi Division, Limited Height, Rh Girder, Cut And Cover Method, EmdParticulars | Details |
---|---|
Title |
Hubballi Division: Gdg Hpt Section: Construction Of Limited Height Subway In Lieu Of Lc No.37 At Km 67/000 100 In Between Kgx Rlp Station Respectively By Rh Girder/Cut And Cover Method.(Maintance Period: 03 (Three) Months
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 73578918 |
Reference Number |
56UBL23-24DT110324ITEM-01 |
Tender Fee | 0 |
EMD | 4.46 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/042024/73578918/viewNitPdf_4480511.pdf |
Start Date | March 12, 2024 23:38 |
End Date |
05/04/2024 ( Expired 381 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Hubballi division- hubballi-ballari section: 1) construction of subway at km 117/000-100 in lieu of lc no.66 at km.117/600-700 between koppal and ginigera stations (balance works). 2) construction of subway in lieu of lc no.62 at km 116/100-200 between koppal and ginigera stations (balance works)
For complete deion and other details, please refer to tender
Read moreHubballi division:gadag-hotgi( gdg-hg) section: construction of limited height subway in lieu of lc no.110 km 243/7-8 in between indi road - lahyan (idr-lhn) station respectively by box pushing method.
For complete deion and other details, please refer to tender
Read moreElectrical work for construction of restricted height subway for trespasser in lieu of closed lc at prr yard near shankar chitralaya by cut & cover method, (b) construction of rub/subway for elimination of manned level crossings 1 no. for jc-52 between cni-prr section, (c) construction of rub/subway for elimination of manned level crossings bg-20 between tle-mhq & bg-26 between mhq-knf section by cut & cover method in adra division of s.e.railway.
For complete deion and other details, please refer to tender
Read moreKhandwa-itarsi section - construction of limited height subway in lieu of level crossing no. 205 at km. 671/20-22 (non-interlocked engineering gate) as 1/5.00 x 4.50 m rcc box with using rh girder (cut and cover method)
For complete deion and other details, please refer to tender
Read moreHubballi division:-prposed replacement of pipe bridge at br.no 33a at km.96/900-97/000 and bridge no:41 at km.104/900-105/000 between bagalkot (bgk) jadramakunti (jrjt) stations by cut and cover rh girder method.
For complete deion and other details, please refer to tender
Read moreHubballi division- hubballi-ballari section: 1) construction of subway at km 117/000-100 in lieu of lc no.66 at km.117/600-700 between koppal and ginigera stations (balance works). 2) construction of subway in lieu of lc no.62 at km 116/100-200 between koppal and ginigera stations (balance works)
For complete deion and other details, please refer to tender
Read moreKhandwa-itarsi section - construction of limited height subway in lieu of level crossing no. 205 at km. 671/20-22 (non-interlocked engineering gate) as 1/5.00 x 4.50 m rcc box with using rh girder (cut and cover method)
For complete deion and other details, please refer to tender
Read moreHubballi division:_ hubballi-londa(ubl-ld) section-construction of limited height subway in lieu of lc.no.315 at km.516/9 to 517/000 in between kambrganvi-kashanatti (kbi-khst) stations by box pushing method. (maintenance period=06 months)
For complete deion and other details, please refer to tender
Read moreSr. den/north/sbc sec : sw i : yesvantpur - sampige road section : proposed limited height subway at old lc 43 (lhs no. 297/b) km 73/000-100 at bheemasandra - rcc box of size 1x5x2.25 by rolling/launching method in aden/yesvantpur sub-division. sw ii : yesvantpur - sampige road section : proposed pedestrian subway at old shettyhalli gate km 67/700-800 near shettyhalli - rcc box of size 1x4x2.25 by rolling/launching method in aden/yesvantpur sub-division. maintenance period is 6 months or one
For complete deion and other details, please refer to tender
Read moreKhandwa-itarsi section - construction of limited height subway in lieu of level crossing no. 205 at km. 671/20-22 (non-interlocked engineering gate) as 1/5.00 x 4.50 m rcc box with using rh girder (cut and cover method)
For complete deion and other details, please refer to tender
Read moreof your Industry type