Tender Details
Particulars | Details |
---|---|
Title |
1 Ton Split Ac,1 5 Ton Split Ac,2 Ton Split Ac,4 Kva Double Booster Stabilizer,5 Kva Double Booster
|
Description |
|
Organisation | Department of Higher Education | Ministry of Education |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | May 10, 2025 21:37 |
End Date |
31/05/2025 ( 0 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Prototype 1,prototype 2,prototype 3,prototype 4,prototype 5,bulk 1,bulk 2,bulk 3,bulk 4,bulk 5
Read more
Procurement of 4 ton floor mounted split air conditioners for maithon ss
Procurement of 4 ton floor mounted split air conditioners for maithon ss
Read moreHiring the services of one number brand new mahindra bolero b4 with ac, 7 seater, diesel driven bs vi model or equivalent for use in row patrolling of mainline from plkm0.0 to plkm34.0 and branch line from plkm0.0 to plkm38.0 under pump station 1 jurisdiction for a period of 4 years
Hiring the services of one number brand new mahindra bolero b4 with ac, 7 seater, diesel driven bs vi model or equivalent for use in row patrolling of mainline from plkm0.0 to plkm34.0 and branch line from plkm0.0 to plkm38.0 under pump station 1 jurisdiction for a period of 4 years
Read moreS no 1,s no 2,s no 3,s no 4,s no 5,s no 6,s no 7,s no 8,s no 9,s no 10,s no 11,s no 12,s no 13,s no
Read more
Unitary air conditioner (window ac) (v2) as per is 1391 (part 1),split air conditioner including gr
Read more
Completion of incomplete wk of provn of 04x02 tonne split type ac with stabilizers alongwith all connected accessories, spl rep for replacement of water coolers, deep freezer desert cooler against ber, provn of 25 kva generator set under ge ramgarh
Completion of incomplete wk of provn of 04x02 tonne split type ac with stabilizers alongwith all connected accessories, spl rep for replacement of water coolers, deep freezer desert cooler against ber, provn of 25 kva generator set under ge ramgarh
Read moreMachinery spares 1,machinery spares 2,machinery spares 3,machinery spares 4,machinery spares 5,mach
Read more
One time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
One time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
Read moreof your Industry type