Tender Details
Particulars | Details |
---|---|
Title |
Under The State Smart City Scheme, Construction Work Of Yatri Niwas On Nazul Land For The Convenience Of Devotees In The Municipal Corporation Ayodhya Dham Of Ayodhya Distric
|
Description |
Under The State Smart City Scheme, Construction Work Of Yatri Niwas On Nazul Land For The Convenience Of Devotees In The Municipal Corporation Ayodhya Dham Of Ayodhya Distric
|
Organisation | Ayodhya Faizabad Development Authority | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 9440 |
EMD | 35.76 Lakh |
Tender Value | |
Place | AYODHYA |
Link |
AAAAAAAAAA Login to view |
Start Date | May 28, 2025 16:40 |
End Date |
03/06/2025 ( 2 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConsultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Consultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Read moreConsultancy services for preparation of dpr and land acquisition of vasmat city bypass road on nh61 connecting to nh61 km 60.00 to km 75.400 in vasmat taluka district hingoli in the state of maharashtra on epc mode. tentative length 17.50 km
Consultancy services for preparation of dpr and land acquisition of vasmat city bypass road on nh61 connecting to nh61 km 60.00 to km 75.400 in vasmat taluka district hingoli in the state of maharashtra on epc mode. tentative length 17.50 km
Read moreConstruction of hl rcc bridge (5x26.50m) in km 19 (kinjer) of nh 33 (old nh 110, km 71) in the district of arwal in the state of bihar for the year 2024 25 under nh divison gaya on epc mode.
Construction of hl rcc bridge (5x26.50m) in km 19 (kinjer) of nh 33 (old nh 110, km 71) in the district of arwal in the state of bihar for the year 2024 25 under nh divison gaya on epc mode.
Read moreConstruction of embankment, dredging of nayanjuli, walking pathway, plantation, bio diversity park along with fencing work at debi ghat at ch 0.50 of kazi nazrul islam avenue of v.i.p road under barasat highway division no.-i in the district of north
Construction of embankment, dredging of nayanjuli, walking pathway, plantation, bio diversity park fencing work at debi ghat at ch 0.50 of kazi nazrul islam avenue of v.i.p road under bhd no.-i in n 24pgs ei work for compound illu and beau.
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreIe services for supervision construction of new 4-lane with paved shoulder from dareota village to kalar bala village of nh-205 (km.33.175 to km 41.000 length 7.825 km) including twin tube tunnel package-iib in himachal pradesh under nh (o) on ham
Ie services for supervision construction of new 4-lane with paved shoulder from dareota village to kalar bala village of nh-205 (km.33.175 to km 41.000 length 7.825 km) including twin tube tunnel package-iib in himachal pradesh under nh (o) on ham
Read moreConstruction work of culvert in the remaining part under the flyover on hariparvat zone, sikandra industrial area master plan road.
Construction work of culvert in the remaining part under the flyover on hariparvat zone, sikandra industrial area master plan road.
Read moreDevelopment work of town hall, library and city museum in paliwal park in municipal corporation, agra.
Development work of town hall, library and city museum in paliwal park in municipal corporation, agra.
Read moreS and s of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 680 zero considered at lapcha on pt 4840 high ground bargiok lapcha rd under 108 rcc 759 brtf sector of project dpk in hp
S and s of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 680 zero considered at lapcha on pt 4840 high ground bargiok lapcha rd under 108 rcc 759 brtf sector of project dpk in hp
Read moreof your Industry type