Tender Details

About Tender

🚂 Procurement Opportunity: Body To Bogie Connecting Swinging Link 🔗 The Ministry Of Railways, Under The Central Government, Invites Bids For The Supply Of Body To Bogie Connecting Swinging Link For Lhb Coaches. 🛤️ 📅 Bid Submission Deadline: July 22, 2024, 2:30 Pm The Tender Fee For Participation Is Inr 57,190. Interested Bidders Must Review The Complete Tender Document For Detailed Specifications And Submission Guidelines. Keywords: Body To Bogie Connecting Swinging Link, Lhb Coaches, Ministry Of Railways, Government Tender, Procurement, Railway Equipment
Particulars Details
Title
Body To Bogie Connecting Swinging Link For Fiat Bogie Of Lhb Coaches
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 106388480
Reference
Number
04240987
Tender Fee 0
EMD 57190
Tender Value -
Place Chennai
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/supply/pdfdocs/072024/106388480/viewNitPdf_4619604.pdf

Start Date June 26, 2024 03:07
End Date
Expired 22/07/2024

Expired 814 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Ie services for development of a link cc connecting the nh-31 varanasi ring road along the river varuna for decongestion of varanasi city pkg1 from km0.000-km11.744 (28.498 km including mcw flyover loop ramp link road) in up on ham

Ie services for development of a link cc connecting the nh-31 varanasi ring road along the river varuna for decongestion of varanasi city pkg1 from km0.000-km11.744 (28.498 km including mcw flyover loop ramp link road) in up on ham

Read more
Construction of road from nikashi subankhata road connecting to uttar chaulkara link road via pitambar pathaks house under sopd (btc) for the financial year 2024-25. tn_51_13 (r-1)

Construction of road from nikashi subankhata road connecting to uttar chaulkara link road via pitambar pathaks house under sopd (btc) for the financial year 2024-25. tn_51_13 (r-1)

Read more
Development of a link/connector corridor connecting the nh 31 and varanasi ring road along the river varuna for decongestion of varanasi city pkg 1 from km 0.000 to km 11.744 (tl 28.498 km including mcw/flyover/loop/ramp/link road) in up on ham.

Development of a link/connector corridor connecting the nh 31 and varanasi ring road along the river varuna for decongestion of varanasi city pkg 1 from km 0.000 to km 11.744 (tl 28.498 km including mcw/flyover/loop/ramp/link road) in up on ham.

Read more
Construction of rcc drain from connecting maharana pratap college gate at dhandera link road to defence colony via chaudhary charan singh chowk in khanpur assembly constituency of district haridwar under state sector (job 5).

Construction of rcc drain from connecting maharana pratap college gate at dhandera link road to defence colony via chaudhary charan singh chowk in khanpur assembly constituency of district haridwar under state sector (job 5).

Read more
Construction of road using sdbc from connecting maharana pratap college gate at dhandera link road to defence colony via chaudhary charan singh chowk in khanpur assembly constituency of district haridwar under state sector (job 4).

Construction of road using sdbc from connecting maharana pratap college gate at dhandera link road to defence colony via chaudhary charan singh chowk in khanpur assembly constituency of district haridwar under state sector (job 4).

Read more
Ie services for development of a link cc connecting the nh-31 varanasi ring road, along the river varuna for decongestion of varanasi city pkg2 from km11.744-km19.420 (14.720 km including mcw loop ramp) in uttar pradesh on ham

Ie services for development of a link cc connecting the nh-31 varanasi ring road, along the river varuna for decongestion of varanasi city pkg2 from km11.744-km19.420 (14.720 km including mcw loop ramp) in uttar pradesh on ham

Read more
Development of a link connector corridor connecting the nh-31 and varanasi ring road along the river varuna for decongestion of varanasi city pkg2 from km11.744-km19.420 (tl 14.720km including loop ramp) in the state of uttar pradesh on ham

Development of a link connector corridor connecting the nh-31 and varanasi ring road along the river varuna for decongestion of varanasi city pkg2 from km11.744-km19.420 (tl 14.720km including loop ramp) in the state of uttar pradesh on ham

Read more
Addn altn to bldg no p 122 karaz repair bay and t 01 scania repair bay with provn repair of drainage around scania repair bay connecting with karaz bay shed no 9 body repair bay gear box sec at technical area of 507 army base workshop under ge n kol

Addn altn to bldg no p 122 karaz repair bay and t 01 scania repair bay with provn repair of drainage around scania repair bay connecting with karaz bay shed no 9 body repair bay gear box sec at technical area of 507 army base workshop under ge n kol

Read more
Lv3 tung 3301.17.1a pin,lv3 tung sb.3304.03.5 articulated connecting rod,lv3 tung 3304-19-3 oh-162 link rod,lv3 tung sb-406-13-44 oh-119 left block,lv3 tung sb-406-12-44 oh-118 right block,lv3 icvs , 20-05-59-3 ring holder,lv3 icvs 20-63-26-1 cover

Lv3 tung 3301.17.1a pin,lv3 tung sb.3304.03.5 articulated connecting rod,lv3 tung 3304-19-3 oh-162 link rod,lv3 tung sb-406-13-44 oh-119 left block,lv3 tung sb-406-12-44 oh-118 right block,lv3 icvs , 20-05-59-3 ring holder,lv3 icvs 20-63-26-1 cover

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise