Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Nhidcl/Meghalaya /Seb/Pkg 1/2024
|
| Description |
Construction Of Mawlynkhung To Mawryngkneng To 4 Lane With Paved Shoulder Configurations In The State Of Meghalaya, From Design Km 0.000 To Km 20.000 (Shillong Eastern Bypass Pkg 1) (Design Length 20.000 Km)
|
| Organisation | National Highways and Infrastructure Development Corporation | Central Govt. Ministry/Department |
| Tender Id | 2024_NHIDC_789443_1 |
|
Reference Number |
NHIDCL/Meghalaya /SEB/PKG-1/2024 |
| Tender Fee | 1.18 Lakh |
| EMD | 9.68 Crore |
| Tender Value | - |
| Place | Shillong |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=829773 |
| Start Date | February 15, 2024 14:30 |
| End Date |
Expired
22/02/2024
Expired 968 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Nhidcl/ ar.pr./h-a/pkg-i/ mjb/28.200/2026
Construction of major bridge at design ch. 28.200 of hunli-anini road (nh-313) in the state of arunachal pradesh on epc mode under sardp
Read moreEmergent maintenance of the existing road of the project construction of 2 laning with hard shoulder of ukhrul tolloi tadubi section of nh 102a from design chainage km 81.870 to km 105.825 pkg 4 at the risk and cost of the epc contractor 3rd call
Read moreConstruction of 4 lane twin tube road cum rail underwater tunnel under river brahmaputra, including 4 lane approaches along with provision of railway infrastructure in one of the tubes, in the state of assam on epc mode
Read moreEmergent repair work of nh 02 stretch from existing ch. km 253.300 karong bridge start point to km 258.100 senapati traffic point total length 4.800 km in the state of manipur in the year 2026-27
Read moreNhidcl/manipur/ 2025/mao-senapati/ strenthening/aafs/
Strengthening of mao to senapati section of old nh-39 (new nh-02) from existing chainage km 212.328 (mao gate) to km 264.313 (taphou kuki) in the state of manipur on epc mode (total length 51.985 km).
Read moreNhidcl/assam/2025 /baihatachariali to missionchariali /260456
Construction of 4 lane highway from baihata chariali (ch. 0.000), near guwahati to tezpur (ch. 150.971) excluding mangaldoi bypass (from ch. 28.500 to ch.42.590) along nh-15 in the state of assam on bot toll mode.
Read moreWidening and development of existing carriageway into 2lane with paved shoulder configuration along with construction of tunnels, viaducts and treatment of vulnerable sliding/sinking zones along nh10 from km 53.50 rangpo to km 79.371 ranipool
Read moreOnsultancy services for authority engineer ae for supervision of pango jorging, singa anleye, kamlang t junction deban and kharsang miao vijaynagar packages of frontier highway nh 913 in arunachal pradesh.
Read moreConstruction of uni-directional singhpora - vailoo twin tube tunnel (under sinthan pass) and its approach roads on kishtwar - vailoo - khanabal section of nh-244 in the union territory of jammu and kashmir on epc mode
Read moreSupply, installation, testing, commissioning, operation maintenance of centralized control and monitoring system (ccms) for street lighting on national highways under nhidcl, ro-agartala on five (05) year contract basis. (3rd call)
Read moreof your Industry type