Tender Details

Particulars Details
Title
Top Cover Assembly1 For Cracking Unit
Description
Organisation Steel Authority of India Limited | Ministry of Steel
Tender Id GEM/2024/B/5425758
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date September 24, 2024 17:01
End Date
Expired 04/10/2024

Expired 738 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Buyer Name: Aman Kumar
Ministry: Ministry Of Steel
Department: Steel Authority Of India Limited
Organisation: Bokaro Steel Plant
Similar Tenders
Roof top rain water harvesting work for type-3 houses in chitrakoot district

Roof top rain water harvesting work for type-3 houses in chitrakoot district

Read more
Construction of cover shed at fruit market yard khanapuram (v) under agriculture market committee khammam of khammam district.

Construction of cover shed at fruit market yard khanapuram (v) under agriculture market committee khammam of khammam district.

Read more
Construction of pcc road and drain with cover from ishawarchand kushwaha's land to g.t. road under ward no. 22 at nagar nigam sasaram

Construction of pcc road and drain with cover from ishawarchand kushwaha's land to g.t. road under ward no. 22 at nagar nigam sasaram

Read more
Magazine size 195mmx27printing of yadagiri masapathrika - telugu wth 36 pages and black and white on 70gsm a-gradewhite maplatho paper cover page on 130gsm

Magazine size 195mmx27printing of yadagiri masapathrika - telugu wth 36 pages and black and white on 70gsm a-gradewhite maplatho paper cover page on 130gsm

Read more
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

Read more
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

Read more
Construction of drain with cover from house of mojibul ansari to nali near hawai field via madarsa in ward no 07 of nagar panchayat birpur. (re tender)

Construction of drain with cover from house of mojibul ansari to nali near hawai field via madarsa in ward no 07 of nagar panchayat birpur. (re tender)

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Supply, demonstration, commissioning of all software/ updation / enhancement from time to time of profometer rebar diameter & advance concrete cover meter, from concrete rebar detection to line scanning, precise concrete rebar cover measurements and diameter estimation with great clarity of precision, ergonomics productivity and technical specification are as follow:- 1. profometer app. - technical specifications:- (i) review modes:- area scan view multiline scan view, (ii) im

Supply, demonstration, commissioning of all software/ updation / enhancement from time to time of profometer rebar diameter & advance concrete cover meter, from concrete rebar detection to line scanning, precise concrete rebar cover measurements and diameter estimation with great clarity of precision, ergonomics productivity and technical specification are as follow:- 1. profometer app. - technical specifications:- (i) review modes:- area scan view multiline scan view, (ii) image processing:- auto rebar spacing first rebar layer neighboring rebar correction first layer neighboring rebar correction second layer, (iii) display settings:- concrete cover threshold slider with color palette, (iv) reporting:- instant report generation jpg (screenshot), (v) display unit specs:- screen size: from 7.9 inch to 12.9 inch, resolution : up to 2732-by-2048, memory: up to 02 tb, weight: down to 301 gm/10.6 oz, camera: up to 12 mp wide and 10 mp ultra wide, optional: usb-c, 5g, face id, (vi) display unit sensors:- three – axis gyro, accelerometer, ambient light sensor barometer built -in- gps/gnss (2) instrument. technical specifications:- (i) technology:- eddy-current, (ii) connection:- wireless, (iii) cover measuring depth:- up to 185 mm/7.3in, (iv) cover measuring accuracy:- +/-1 mm/ 0.04 in to 4 mm/ 0.16 in depending on depth , (v) rebar diameter measuring depth:- up to 63 mm/2.5 in, (vi) rebar diameter measuring accuracy:- +/-1 rebar size (possible under optimal conditions. please refer to the manual), (vii) encoder accuracy:- +/-0.5 mm/0.02 in +0.05% of measured length, (viii) max scanning speed:- 0.5 m/s – 1.7 ft/s, (ix) max line scan distance:- 1 km/ 0.6 miles, (x) display:- high-contrast loed screen, (xi) dimensions:-250x130x45 mm / 9.8x5.1x1.8 in (with cart), 190x75x45 mm / 7.5x3.0x1.8 in (without cart) (xii) weight:- 690 gm/ 1.5 ib (with cart), 300 gm / 0.7 ib (without cart), (xiii) battery:- 2x aa(nimh) rechargeable or non rechargeable removable flight-safe, 8 hours autonomy, usb-c power bank (not included)

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise