Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Up Gradation And Widening Of Sayli Rakholi Road At Silvassa Ch. 0 Plus 000 To Ch. 5 Plus 900 Epc Mode 2nd Call
|
| Description |
Up Gradation And Widening Of Sayli Rakholi Road At Silvassa Ch. 0 Plus 000 To Ch. 5 Plus 900 Epc Mode 2nd Call
|
| Organisation | Government of Dadra and Nagar Haveli (U.T) |
| Tender Id | 2023_UTDNH_6724_1 |
|
Reference Number |
E-Tender Notice No. 09 of 2023-24 (Road) |
| Tender Fee | 10000 |
| EMD | 52.24 Lakh |
| Tender Value | - |
| Place | Executive Engineer PWD.II Road DNH, Silvassa |
| Link |
View Original Tender Notice
https://dnhtenders.gov.in |
| Start Date | September 21, 2023 23:30 |
| End Date |
Expired
05/10/2023
Expired 1105 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Reconstruction of damaged pipe culverts - 2 nos. (ch.108/000 and 127/500), slab culverts - 4 nos. (ch.113/800, 114/900, 118/600 and 127/000), and minor bridge at ch. 15/900 on nh-927a
Reconstruction of damaged pipe culverts - 2 nos. (ch.108/000 and 127/500), slab culverts - 4 nos. (ch.113/800, 114/900, 118/600 and 127/000), and minor bridge at ch. 15/900 on nh-927a
Read moreAuthority engineer for supervision of up-gradation of existing highway to 4laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode
Authority engineer for supervision of up-gradation of existing highway to 4laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode
Read moreConstruction of iwai office building g plus 8 plus 1no service floor total 10 floors at fancy bazar guwahati assam in epc mode
Construction of iwai office building g plus 8 plus 1no service floor total 10 floors at fancy bazar guwahati assam in epc mode
Read moreUp gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra
Up gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra
Read moreRisk and cost work for up gradation of paithan to shirur for section ch..00.00 to ch..55. 937 nh 752e to two lane with paved shoulders in the state of maharashtra on engineering, procurement and construction epc mode basis contract.
Risk and cost work for up gradation of paithan to shirur for section ch..00.00 to ch..55. 937 nh 752e to two lane with paved shoulders in the state of maharashtra on engineering, procurement and construction epc mode basis contract.
Read moreRisk and cost work for up gradation of paithan to shirur for section ch..00.00 to ch..55. 937 nh 752e to two lane with paved shoulders in the state of maharashtra on engineering, procurement and construction epc mode basis contract.
Risk and cost work for up gradation of paithan to shirur for section ch..00.00 to ch..55. 937 nh 752e to two lane with paved shoulders in the state of maharashtra on engineering, procurement and construction epc mode basis contract.
Read moreConstruction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Read moreConstruction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
Read moreUpgradation of existing highway to 4 laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode.
Upgradation of existing highway to 4 laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode.
Read moreUpgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2-lps in the state of madhya pradesh on epc mode
Upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2-lps in the state of madhya pradesh on epc mode
Read moreof your Industry type