Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Remaining Work Of Unfinished Houses Of Kaat Bangla Slum In Dehradun Under Nagar Nigam Dehradun.
|
Description |
Construction Of Remaining Work Of Unfinished Houses Of Kaat Bangla Slum In Dehradun Under Nagar Nigam Dehradun.
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_pwd_73352_1 |
Reference Number |
4044/1C-9/2024, Dated 05-07-2024 |
Tender Fee | 5900 |
EMD | 13.94 Lakh |
Tender Value | |
Place | Kaat Bangla Slum area in Dehradun |
Link | https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=87895 |
Start Date | July 16, 2024 20:30 |
End Date |
22/07/2024 ( Expired 301 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConstruction of 2l - ps configuration karauli bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan
Construction of 2l- ps configuration karauli bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreConstruction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Read moreConstruction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Read moreZonal work ward 13 to 24 under area of nagar palika barwani such as nali,nali crossing,rcc pipe laying,paver work,chamber of drainage and water works,repair work,etc on uadd sor 2021
Zonal work ward 13 to 24 under area of nagar palika barwani such as nali,nali crossing,rcc pipe laying,paver work,chamber of drainage and water works,repair work,etc on uadd sor 2021
Read moreConstruction work of c.c. road and cross drain in sankat mochan gali, anil gali, chaurasia lodge gali and panchmukhi hanuman gali in jawaharganj ward, sagar-parshad nidhi
Construction work of c.c. road and cross drain in sankat mochan gali, anil gali, chaurasia lodge gali and panchmukhi hanuman gali in jawaharganj ward, sagar-parshad nidhi
Read moreConstruction work of cc road at five places, boundary wall and retaining wall including gate near mangal bhawan and paver block work in the courtyard of ambedkar mangal bhawan etc. in bhagwanganj ward, sagar-parshad nidhi
Construction work of cc road at five places, boundary wall and retaining wall including gate near mangal bhawan and paver block work in the courtyard of ambedkar mangal bhawan etc. in bhagwanganj ward, sagar-parshad nidhi
Read moreof your Industry type