Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Iitr/Cw 16(07)/25 26/Works
|
Description |
Construction Of Guest House In Porta Cabins And Renovation Of Existing Security Staff Room To Convert Into Vip Guest House At Main Campus Csir Iitr Lucknow
|
Organisation | Council of Scientific and Industrial Research | Public Sector Undertakings |
Tender Id | 2025_CSIR_234316_1 |
Reference Number |
IITR/CW-16(07)/2025-26/Works |
Tender Fee | 0 |
EMD | 75960 |
Tender Value | |
Place | Vishvigyan Bhawan 31 Mahatma Gandhi Marg Lucknow |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=265448 |
Start Date | May 02, 2025 18:00 |
End Date |
08/05/2025 ( Expired 37 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.
Construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.
Read moreDesign and construction of property development buildings in land parcels at existing mandaveli bus depot and terminus including civil, architectural finishes, plumbing, e and m, hvac, lifts and all associated works
Design and construction of 
 property development buildings in land parcels at existing mandaveli bus 
 depot and terminus including civil, architectural finishes, plumbing, e and m, 
 hvac, lifts and all associated works
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction of r.c.c.drain in ward no 2 manish verma house to ramjan bhaijan house at chourai
Construction of r.c.c.drain in ward no 2 manish verma house to ramjan bhaijan house at chourai
Read moreConstruction of pcc drain from ihsdp colony to mutuja khan house and various places at ward no.41
Construction of pcc drain from ihsdp colony to mutuja khan house and various places at ward no.41
Read moreModification of chain link fencing into security boundary wall and raising the height of entire wall (860 mtrs) from 08 feet to 12 feet and reconstruction of existing low security chain link fencing to high security boundary wall with watch tower...
Modification of chain link fencing into security boundary wall and raising the height of entire wall (860 mtrs) from 08 feet to 12 feet and reconstruction of existing low security chain link fencing to high security boundary wall with watch tower ...
Read moreLaying of paver blocks from mohada dafaai from achhelals house via baigan basti and basor mohalla to st. joseph till the main road of tyagi hotel and naman agency at ward no 6
Laying of paver blocks from mohada dafaai from achhelals house via baigan basti and basor mohalla to st. joseph till the main road of tyagi hotel and naman agency at ward no 6
Read moreConstruction of cc road at ward no. 18 laxmi narayan mandit to main road malajkhand in municipal council malajkhand.
Construction of cc road at ward no. 18 laxmi narayan mandit to main road malajkhand in municipal council malajkhand.
Read moreof your Industry type