Tender Details

Particulars Details
Title
Formation Works Involving Earthwork In Filling In Embankment, Cutting And Blanketing, Bridge Works Involving Construction Of Important Bridges, Major Bridges, Minor Bridges, Road Under Bridges/Limited Height Subways, Foot Over Bridges, Trolley Refuges, Toe Wall, Retaining Wall, Pitching, Side Drain, Building Works Involving Construction Of Station Buildings And Other Service Buildings Related To Civil And Traction Distribution, Platform Shelters, Staff Quarters, P.Way Works Involving Supplying
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 77028569
Reference
Number
419150427
Tender Fee 0
EMD 1 Crore
Tender Value -
Place Jaipur
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/122024/77028569/viewNitPdf_4691588.pdf

Start Date November 19, 2024 00:24
End Date
Expired 16/12/2024

Expired 669 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Engineering procurement and construction (epc) of construction of viaducts, ror/rfo, major bridges, minor bridges, animal underpass, rub/lhs, tunnel/cut-cover, earthwork, blanketing, trolley refuge, turfing, buildings, retaining wall, toe wall etc. and other associated worksfor construction of new double line track for dfcc loading from ch.158.00 to ch.184 in koderma detour section in sonnagar-andal 3rd and 4th line project on epc mode in dhanbad division of east central railway.

Engineering procurement and construction (epc) of construction of viaducts, ror/rfo, major bridges, minor bridges, animal underpass, rub/lhs, tunnel/cut-cover, earthwork, blanketing, trolley refuge, turfing, buildings, retaining wall, toe wall etc. and other associated worksfor construction of new double line track for dfcc loading from ch.158.00 to ch.184 in koderma detour section in sonnagar-andal 3rd and 4th line project on epc mode in dhanbad division of east central railway.

Read more
Jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl

Jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl

Read more
Construction of 3rd line work including earthwork, blanketing, minor bridges, important bridges and other miscellaneous works for 25.0t of indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction and power supply in connection with the 3rd line work of madhukunda-damodar section in adra division of south eastern railway on engineering, procurement &

Construction of 3rd line work including earthwork, blanketing, minor bridges, important bridges and other miscellaneous works for 25.0t of indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction and power supply in connection with the 3rd line work of madhukunda-damodar section in adra division of south eastern railway on engineering, procurement &

Read more
Construction of new railway line between deshalpar - hajipir - luna (82.38kms) (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works i

Construction of new railway line between deshalpar - hajipir - luna (82.38kms) (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works i

Read more
Construction of 2nd new railway line (doubling works) between section kanalus(including) - okha (including) from km:853.36 to km:994.35 (including all yards and stations falling in the section) covering all works that are earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs, all p. way works (including laying and linking), supply of all types of sleepers, all p. way fittings, other civil engineering works, signal & telecommunica

Construction of 2nd new railway line (doubling works) between section kanalus(including) - okha (including) from km:853.36 to km:994.35 (including all yards and stations falling in the section) covering all works that are earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs, all p. way works (including laying and linking), supply of all types of sleepers, all p. way fittings, other civil engineering works, signal & telecommunica

Read more
Construction of new railway line between vayor - lakhpat (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works in ahmedabad division

Construction of new railway line between vayor - lakhpat (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works in ahmedabad division

Read more
Engineering procurement and construction (epc) for construction of doubling work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, track works, platform work, station building, fobs, other buildings, associated s&t and electrical utility shifting works and associated miscellaneous works for 25t indian railway standard loading from karnauti station(including-ch. 2.844 km) to bihar sharif station(excluding-ch 29.350 km), from ch. 1.900 km to 28.192 km (total- 2

Engineering procurement and construction (epc) for construction of doubling work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, track works, platform work, station building, fobs, other buildings, associated s&t and electrical utility shifting works and associated miscellaneous works for 25t indian railway standard loading from karnauti station(including-ch. 2.844 km) to bihar sharif station(excluding-ch 29.350 km), from ch. 1.900 km to 28.192 km (total- 2

Read more
Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi

Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi

Read more
Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi

Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise