Tender Details
Particulars | Details |
---|---|
Title |
S/A Of Dipstick, Part No. B5028203 Hase. 1,Rubber Packing For Strap, Part No. X 1200550 Hase,Rubber
|
Description |
|
Organisation | Department of Defence Production | Ministry of Defence |
Tender Id | GEM/2024/B/4445129 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | January 08, 2024 22:41 |
End Date |
29/01/2024 ( Expired 494 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreAppointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Read moreConstruction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Read moreConstruction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Read moreNib for supply and etc of 132 kv gss 113 rd sbs (distt jaisalmer) alongwith associated line (132 kv d/c parewar 113 rd sbs line (45 km d/c) and 02 no. of 132 kv bay at132 kv gss, parewar
Nib for supply and etc of 132 kv gss 113 rd sbs (distt jaisalmer) alongwith associated line (132 kv d/c parewar 113 rd sbs line (45 km d/c) and 02 no. of 132 kv bay at132 kv gss, parewar
Read moreProvn of additional sheds for drying, folding, packing and storage of parachutes at afs mohanbari
Provn of additional sheds for drying, folding, packing and storage of parachutes at afs mohanbari
Read moreConstruction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreImplementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreSelection of project management company (pmc) for project management consultancy services (pmcs) and detailed design consultant (ddc) for chennai metro rail phase 1 network capacity enhancement project
Selection of project management company (pmc) for project management consultancy services (pmcs) and detailed design consultant (ddc) for chennai metro rail phase 1 network capacity enhancement project
Read moreof your Industry type