Tender Details

Particulars Details
Title
Supply, Installation, Testing And Commissioning Of Sensor Actuated Plc Based Fully Automatic Foggy Dense Mist Generating Shower System For New Y Curve Siding, Lakhanpur Area, Mcl
Description
Supply, Installation, Testing And Commissioning Of Sensor Actuated Plc Based Fully Automatic Foggy Dense Mist Generating Shower System For New Y Curve Siding, Lakhanpur Area, Mcl
Organisation Coal India Limited (CIL)
Tender Id 2023_MCL_281270_1
Reference
Number
MCL/LKPA/EnM/eNIT/23-24/33 dt-13.06.2023
Tender Fee -
EMD 2.24 Lakh
Tender Value -
Place Offfice of the Staff Officer(EnM), Lakhanpur Area
Link
View Original Tender Notice

https://coalindiatenders.nic.in

Start Date June 14, 2023 15:30
End Date
Expired 03/07/2023

Expired 1201 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Repairing or modification of existing sensor actuated plc based fully foggy foggy mist generating er system for new y curve siding at ilbl ocp, lakhanpur area, mcl

Repairing or modification of existing sensor actuated plc based fully foggy foggy mist generating er system for new y curve siding at ilbl ocp, lakhanpur area, mcl

Read more
Upgradation of existing manual sprinkler system to sensor actuated based fully foggy mist generating er system installed near enm workshop of ilbl ocp, lakhanpur aea, mcl.

Upgradation of existing manual sprinkler system to sensor actuated based fully foggy mist generating er system installed near enm workshop of ilbl ocp, lakhanpur aea, mcl.

Read more
Providing power supply arrangement for proposed y- curve siding at lakhanpur ocp, lakhanpur area, mcl

Providing power supply arrangement for proposed y- curve siding at lakhanpur ocp, lakhanpur area, mcl

Read more
Installation of diesel pump-motor set, laying of m.s. pipe line at laikera railway bridge for transporting water with insta n comm of sensor actuated plc based fully automatic foggy dense-mist generating system with amc 2 years at laikera kocp ba

Installation of diesel pump-motor set, laying of m.s. pipe line at laikera railway bridge for transporting water with insta n comm of sensor actuated plc based fully automatic foggy dense-mist generating system with amc 2 years at laikera kocp ba

Read more
Fabrication, restoration, supply, fitting, installation and testing of auto timer actuated foggy dense mist generating er system with all accessories aimed at mitigating dust emissions and addressing various environmental effects in and around dd

Fabrication, restoration, supply, fitting, installation and testing of auto timer actuated foggy dense mist generating er system with all accessories aimed at mitigating dust emissions and addressing various environmental effects in and around dd

Read more
Installation, commissioning and trial of sensor actuated, fully automatic, foggy-mist generating instant shower system for spraying water on coal transporting tippers to be installed at ct road near in-motion weighbridge no. 2and3 of ananta ocp

Installation, commissioning and trial of sensor actuated, fully automatic, foggy-mist generating instant shower system for spraying water on coal transporting tippers to be installed at ct road near in-motion weighbridge no. 2and3 of ananta ocp

Read more
Installation, commissioning and trial of sensor actuated, fully automatic, foggy-mist generating instant shower system for spraying water on coal transporting tippers to be installed at ct road near in-motion weighbridge no. 2 and 3 of ananta ocp

Installation, commissioning and trial of sensor actuated, fully automatic, foggy-mist generating instant shower system for spraying water on coal transporting tippers to be installed at ct road near in-motion weighbridge no. 2 and 3 of ananta ocp

Read more
Repair of wiring arrangements of siding in-charge room, sampling room and control room of y-curve siding, ilbl ocp, lakhanpur area, mcl

Repair of wiring arrangements of siding in-charge room, sampling room and control room of y-curve siding, ilbl ocp, lakhanpur area, mcl

Read more
Laying and dismantling of 8 inch , 6 inch and 4 inch dia. m.s pipeline from samleshwari ocp to new y-curve siding for water supply at lakhanpur ocp, lakhanpur area, mcl

Laying and dismantling of 8 inch , 6 inch and 4 inch dia. m.s pipeline from samleshwari ocp to new y-curve siding for water supply at lakhanpur ocp, lakhanpur area, mcl

Read more
Design, supply, installation and commissioning of plc based fullyautomatic (sequential operation) and manual operated, dense mist typedust suppression system for coal stack yard covering 06 number of piles.

Design, supply, installation and commissioning of plc based fullyautomatic (sequential operation) and manual operated, dense mist typedust suppression system for coal stack yard covering 06 number of piles.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise