Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Laying And Dismantling Of 8 Inch , 6 Inch And 4 Inch Dia. M.S Pipeline From Samleshwari Ocp To New Y Curve Siding For Water Supply At Lakhanpur Ocp, Lakhanpur Area, Mcl
|
| Description |
Laying And Dismantling Of 8 Inch , 6 Inch And 4 Inch Dia. M.S Pipeline From Samleshwari Ocp To New Y Curve Siding For Water Supply At Lakhanpur Ocp, Lakhanpur Area, Mcl
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_MCL_288728_1 |
|
Reference Number |
MCL/LKPA/EnM/eNIT/23-24/77 dt-13.09.2023 |
| Tender Fee | |
| EMD | 27400 |
| Tender Value | |
| Place | Offfice of the Staff Officer(EnM), Lakhanpur Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | September 14, 2023 15:30 |
| End Date |
Expired
25/09/2023
Expired 997 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Laying of 8 inch steel gas pipeline by hdd method for crossing of gurupura river and associated works at dakshin kannada ga cgd project of gail gas limited
Laying of 8 inch steel gas pipeline by hdd method for crossing of gurupura river and associated works at dakshin kannada ga cgd project of gail gas limited
Read moreProviding 02 nos. drinking pvc water tanks in kulda truck parking area and supplying drinking water through tanker for 365 days at kulda ocp of basundhara area
Providing 02 nos. drinking pvc water tanks in kulda truck parking area and supplying drinking water through tanker for 365 days at kulda ocp of basundhara area
Read moreA/mtc of water supply in se...
A/mtc of water supply in sector-56-56a, faridabad. repairing of leakages at various places laying, jointing di pipes, c.i sluice valves, ci special from byepass road sector-65 to 56a, and internal leakages in sector-56-56a, faridabad and all other w
Read moreDesign, supply, installation, testing and commissioning of entire pipeline system from mph to s-4 and from s-4 pump house to connected branches sprinkling system and automation using of self dynamic hydro control val
Design, supply, installation, testing and commissioning of entire pipeline system from mph to s-4 and from s-4 pump house to connected branches 
 sprinkling system and automation using of self dynamic hydro control val
Read moreSupply and fixing of double interposing gland bush for different control panels at 3.3kv main substation of karma ocp under kuju area.
Supply and fixing of double interposing gland bush for different control panels at 3.3kv main substation of karma ocp under kuju area.
Read moreRepair maintenance of main water supply pipe line in south camp tech area new project trg area air enclave and prayag vihar and allied area at af stn bamrauli under ge af bamrauli
Repair maintenance of main water supply pipe line in south camp tech area new project trg area air enclave and prayag vihar and allied area at af stn bamrauli under ge af bamrauli
Read moreDe-silting of inflow channel and intake well located near wardha river for water supply to residential colony of neeljay sub area of wani area.
De-silting of inflow channel and intake well located near wardha river for water supply to residential colony of neeljay sub area of wani area.
Read moreSupply of potable water from allikulam to voc wharf pump house through private water lorry for a period of one year as and when required inside green gate at vocpa.
Supply of potable water from allikulam to voc wharf pump house through private water lorry for a period of one year as and when required inside green gate at vocpa.
Read moreEngagement of tractor mounted water tanker (02 nos. tanker) on hire for supply of drinking water at lalmatia colony rehab site (nasir grp and rafique grp.) under rajmahal area for 365 days.
Engagement of tractor mounted water tanker (02 nos. tanker) on hire for supply of drinking water at lalmatia colony rehab site (nasir grp and rafique grp.) under rajmahal area for 365 days.
Read moreStrengthening of kutcha approach road to coal stock junction and existing wbm road from check post 4 to cement concrete road at gouri pouni expansion ocm under gouri pouni sub area
Strengthening of kutcha approach road to coal stock junction and existing wbm road from check post 4 to cement concrete road at gouri pouni expansion ocm under gouri pouni sub area
Read moreof your Industry type