| Particulars | Details |
|---|---|
| Title |
Turnkey Works Of Augmentation Of 66 Kv Lines With Htls Conductor
|
| Description |
Turnkey Works Of Augmentation Of 66 Kv Lines With Htls Conductor
|
| Organisation | Department of Power | State Govt. and UT |
| Tender Id | 2025_POWER_141238_1 |
|
Reference Number |
TSQ-1171 |
| Tender Fee | 5900 |
| EMD | 20 Lakh |
| Tender Value | - |
| Place | Punjab |
| Link |
View Original Tender Notice
https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=286298 |
| Start Date | May 29, 2025 14:30 |
| End Date |
Expired
30/06/2025
Expired 469 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply,erection,testing and commissioning of lot 1 i) 2nd circuit stringing (15.2 km) on existing 132 kv jakora-kotagiri dc/sc line with 1st circuit live ii)1 no. 132 kv bay at 132/33 kv ss jakora (iii) 1no.132 kv bay at 132/33 kv ss kotagiri in nizamabad district and lot-ii 33 kv features with 2x50 mva ptr at existing at 220/132 kv ss kamareddy in kamareddy district on turnkey basis
Supply,erection,testing and commissioning of lot 1 i) 2nd circuit stringing (15.2 km) on existing 132 kv jakora-kotagiri dc/sc line with 1st circuit live ii)1 no. 132 kv bay at 132/33 kv ss jakora (iii) 1no.132 kv bay at 132/33 kv ss kotagiri in nizamabad district and lot-ii 33 kv features with 2x50 mva ptr at existing at 220/132 kv ss kamareddy in kamareddy district on turnkey basis
Read moreProposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis
Proposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis
Read moreErection of 33/11kv substation with connected 33kv and 11kv lines at thatipally (v) in sirikonda (m) of dichpally division of nizamabad circle under t and d/ si scheme on partial turnkey basis..
Erection of 33/11kv substation with connected 33kv and 11kv lines at thatipally (v) in sirikonda (m) of dichpally division of nizamabad circle under t and d/ si scheme on partial turnkey basis..
Read moreErection of 33/11kv substation with connected 33kv and 11kv lines at peddamidisileru (v) in cherla (m) of bhadrachalam division of operation circle kothagudem under t and d/ si scheme on partial turnkey basis.
Erection of 33/11kv substation with connected 33kv and 11kv lines at peddamidisileru (v) in cherla (m) of bhadrachalam division of operation circle kothagudem under t and d/ si scheme on partial turnkey basis.
Read moreErection of 33/11kv substation with connected 33kv and 11kv lines at sarvapur (v) in mulugu (m) of mulugu division of operation circle bhupalpally under t and d/ si scheme on partial turnkey basis.
Erection of 33/11kv substation with connected 33kv and 11kv lines at sarvapur (v) in mulugu (m) of mulugu division of operation circle bhupalpally under t and d/ si scheme on partial turnkey basis.
Read moreErection of 33/11kv substation with connected 33kv and 11kv lines at rudragudem (v) in nallabelly (m) of narsampet division of operation circle warangal under t and d/ si scheme on partial turnkey basis.
Erection of 33/11kv substation with connected 33kv and 11kv lines at rudragudem (v) in nallabelly (m) of narsampet division of operation circle warangal under t and d/ si scheme on partial turnkey basis.
Read moreErection of 33/11kv substation with connected 33kv and 11kv lines at kurla (v) in dongili (m) of banswada division of operation kamareddy circle under t and d/ si scheme on partial turnkey basis.
Erection of 33/11kv substation with connected 33kv and 11kv lines at kurla (v) in dongili (m) of banswada division of operation kamareddy circle under t and d/ si scheme on partial turnkey basis.
Read moreErection of 33/11kv substation with connected 33kv and 11kv lines at gundenga (v) in gudur (m) of mahabubabad division of operation circle mahabubabad under t and d/ si scheme on partial turnkey basis.
Erection of 33/11kv substation with connected 33kv and 11kv lines at gundenga (v) in gudur (m) of mahabubabad division of operation circle mahabubabad under t and d/ si scheme on partial turnkey basis.
Read moreErection of 33/11kv substation with connected 33kv and 11kv lines at buddaram (v) in ghanpur (m) of bhupalpally division of operation circle bhupalpally under t and d/ si scheme on partial turnkey basis.
Erection of 33/11kv substation with connected 33kv and 11kv lines at buddaram (v) in ghanpur (m) of bhupalpally division of operation circle bhupalpally under t and d/ si scheme on partial turnkey basis.
Read moreErection of 33/11kv substation with connected 33kv and 11kv lines at venkatapuram (v) in vemsoor (m) of sathupally division of operation circle khammam under t and d/ si scheme on partial turnkey basis.
Erection of 33/11kv substation with connected 33kv and 11kv lines at venkatapuram (v) in vemsoor (m) of sathupally division of operation circle khammam under t and d/ si scheme on partial turnkey basis.
Read moreof your Industry type