| Title |
Experimental Steam Turbine Rig
|
| Description |
|
| Organisation | Higher Education Department Delhi | undefined |
| Tender Id | GEM/2023/B/3917444 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | September 06, 2023 01:27 |
| End Date |
Expired
26/09/2023
Expired 1115 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|---|
| 1 | CALIBER INSTRUMENTS AND ENGINEERING SERVICES | Make : CALIBER Model : CS01 Title : Experimental Steam Turbine Test Rig | 26-09-2023 12:45:09 | Registered with designated Agency / Authority | MII MSE | Disqualified |
| 2 | DATACONE ENGINEERS & AGRO PROCESSERS | Make : Datacone engineers Model : FM-056 Title : Steam Power plant | 24-09-2023 14:38:47 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 3 | HANSA INSTRUMENTS COMPANY | Make : HANSA Model : HIST Title : Steam Turbine Test Rig | 26-09-2023 11:21:10 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 4 | K C ENGINEERS LIMITED | Make : Engineering Growth Connection Model : KCTD-1601 Title : Experimental Steam Turbine Test Rig | 26-09-2023 10:10:28 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 5 | Tech Ed Equipment Company | Make : TECH-ED Model : IC021A Title : Exprimental Steam Turbine Test Rig | 26-09-2023 09:13:20 | Registered with designated Agency / Authority | MII MSE | Qualified |
Single stage, vertical, back pressure steam turbine
Supply, erection and commissioning of single stage, vertical, back pressure steam turbine
Read moreAmc of steam turbine , auxilary and eot crane
Annual mechanical maintenance work of stg and its auxiliary and eot/gantry cranes of stage # i, ii and iii at rgtpp, ramgarh and 249 rd pump house at ramgarh
Read moreTtps mechii tm i unitiii overhauling of steam and condensate valves of turbine regeneration system during the forthcoming annual overhaul
Ttps mechii tm i unitiii overhauling of steam and condensate valves of turbine regeneration system during the forthcoming annual overhaul
Read moreTtps mechii tm ii unitv kwu turbine inspection overhauling and commissioning of actuators of steam line valves during annual overhaul 2026 27
Ttps mechii tm ii unitv kwu turbine inspection overhauling and commissioning of actuators of steam line valves during annual overhaul 2026 27
Read moreTtps mechii tm ii unitiv kwu turbine inspection overhauling and commissioning of actuators of steam line valves during annual overhaul 2026 27
Ttps mechii tm ii unitiv kwu turbine inspection overhauling and commissioning of actuators of steam line valves during annual overhaul 2026 27
Read moreTtps mech ii tm i unit iii inspection overhauling rectification of condenser steam side longitudinal bellows hp lp bypass valves and oil system steam and condensate valves for main turbine system during the forthcoming annual overhaul
Ttps mech ii tm i unit iii inspection overhauling rectification of condenser steam side longitudinal bellows hp lp bypass valves and oil system steam and condensate valves for main turbine system during the forthcoming annual overhaul
Read moreCustom bid for services - experimental readiness for blast trials
Custom bid for services - experimental readiness for blast trials
Read moreSteam bath,steam room false ceiling,steam room door,steam room vapor proof wall light,plumbing work for steam room,civil work for steam room,sauna bath,accessories kit,sauna heater 12kw,plumbing work for sauna bath,civil work for sauna bath
Steam bath,steam room false ceiling,steam room door,steam room vapor proof wall light,plumbing work for steam room,civil work for steam room,sauna bath,accessories kit,sauna heater 12kw,plumbing work for sauna bath,civil work for sauna bath
Read moreExperimental setup for product recovery as per attached technical specifications
Experimental setup for product recovery as per attached technical specifications
Read moreExperimental setup integrating optical, thermal radar for anti stealth lab
Experimental setup integrating optical, thermal radar for anti stealth lab
Read moreof your Industry type