| Particulars | Details |
|---|---|
| Title |
Construction Of Retaining Wall To Stop Erosion Of Earth At Ruined Quila Prithviraj Chauhans Fort Hansi, Haryana
|
| Description |
Construction Of Retaining Wall To Stop Erosion Of Earth At Ruined Quila Prithviraj Chauhans Fort Hansi, Haryana
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_ASI_764346_1 |
|
Reference Number |
3/15/MW/2023/CHD |
| Tender Fee | 500 |
| EMD | 1.13 Lakh |
| Tender Value | - |
| Place | ASI CHANDIGARH |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | July 29, 2023 22:30 |
| End Date |
Expired
15/08/2023
Expired 1161 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreMw to redevelopment of archaeological garden at ruined quila (prithviraj chauhans fort) hansi, hisar, haryana
Mw to redevelopment of archaeological garden at ruined quila (prithviraj chauhans fort) hansi, hisar, haryana
Read moreProviding grill fencing over dwarf wall, pathway and other amenities at ruined quila (prithviraj chauhan fort) hansi, haryana
Providing grill fencing over dwarf wall, pathway and other amenities at ruined quila (prithviraj chauhan fort) hansi, haryana
Read moreDevelopment works and bulk services for bn hq umpling shillong sh iii retaining wall near residential qtrs of bns to protect the earth erosion
Development works and bulk services for bn hq umpling shillong sh iii 
 retaining wall near residential qtrs of bns to protect the earth erosion
Read moreConstruction of retaining wall in back side of the north maheshpur hs school for protection of the existing building from erosion of soil earth under kathalia block of sepahijala district under special package for post flood maintenance and restorati
Construction of retaining wall in back side of the north maheshpur hs school for protection of the existing building from erosion of soil earth under kathalia block of sepahijala district under special package for post flood maintenance and restorati
Read moreof your Industry type