Tender Details

Particulars Details
Title
Assistance Of Hydraulic Excavator/Pc Machine Minimum 210 On As And When Required Basis For Carrying Out Work Related To Pumps And Pipelines For A Period Of 120 Days (824 Hours) Kocp For Monsoon 2024 25.
Description
Assistance Of Hydraulic Excavator/Pc Machine Minimum 210 On As And When Required Basis For Carrying Out Work Related To Pumps And Pipelines For A Period Of 120 Days (824 Hours) Kocp For Monsoon 2024 25.
Organisation South Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_SECL_299805_1
Reference
Number
SECL/GM/KSM/EnM/ eTender/23-24/56
Tender Fee 0
EMD 28300
Tender Value
Place KUSMUNDA OPEN CAST PROJECT
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=310564

Start Date January 30, 2024 16:30
End Date
Expired 09/02/2024

Expired 868 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Assistance of hydraulic excavator/pc machine minimum 210 on as and when required basis for carrying out work related to pumps and pipelines for a period of 120 days (824 hours) kocp for monsoon 2024-25.

Assistance of hydraulic excavator/pc machine minimum 210 on as and when required basis for carrying out work related to pumps and pipelines for a period of 120 days (824 hours) kocp for monsoon 2024-25.

Read more
Hiring of 0.5 cum,, 75hp capacity hydraulic excavator on hourly basis

Hiring of 0.50cu.m, 75hp capacity hydraulic excavator on hourly basis, as and when required basis for a period of two years for using at various places in departments of srp area as per the scope of work, terms and conditions of nit

Read more
Assistance in day to day maintenance of pump, pipelines and accessories at quarry, kocp for a period of 2 years (730 days)

Assistance in day to day maintenance of pump, pipelines and accessories at quarry, kocp for a period of 2 years (730 days)

Read more
Mechanical assistance with manpower for cleaning of oversized coal/shale lump, slush, overflown materials, etc. from the trs 2 and 3 on as and when required basis for cleaning/earth work etc. related to chp, kocp for a period of 365 days.

Mechanical assistance with manpower for cleaning of oversized coal/shale lump, slush, overflown materials, etc. from the trs 2 and 3 on as and when required basis for cleaning/earth work etc. related to chp, kocp for a period of 365 days.

Read more
Mechanical assistance for the work cutting and widening of drain cleaning road side accumulated ob/earth by deploying 3d hydraulic excavator 210 or more capacity (pc-210) and 2d mini excavator at different location of mine area during monsoon gevra p

Mechanical assistance for the work cutting and widening of drain cleaning road side accumulated ob/earth by deploying 3d hydraulic excavator 210 or more capacity (pc-210) and 2d mini excavator at different location of mine area during monsoon gevra p

Read more
Carrying out the structural steel work in all sections of chp, bina project (ncl) on as and when required basis within 730 days.

Carrying out the structural steel work in all sections of chp, bina project (ncl) on as and when required basis within 730 days.

Read more
Day to day works related to dismantling,shifting, laying,fitting, commissioning, installation of pipelines/pumps in the mines for dewatering,tanker loading etc.as and when required basis for the period of365 days as per the direction ofeic of locp,la

Day to day works related to dismantling,shifting, laying,fitting, commissioning, installation of pipelines/pumps in the mines for dewatering,tanker loading etc.as and when required basis for the period of365 days as per the direction ofeic of locp,la

Read more
Day to day works related to dismantling, shifting, laying, fitting, commissioning, installation of pipelines/pumps in the mines for dewatering, tanker loading etc. as and when required basis for the period of 365 days as per the direction of eicat la

Day to day works related to dismantling, shifting, laying, fitting, commissioning, installation of pipelines/pumps in the mines for dewatering, tanker loading etc.as and when required basis for the period of 365 days as per the direction of eic at la

Read more
Day-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related to different coal faces at quarry on as and when required basis for a period of 365 days at dep.

Day-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related to different coal faces at quarry on as and when required basis for a period of 365 days at dep.

Read more
Miscellaneous electrical maintenance related work for 365 days on as and when required at chp kakri project.

Miscellaneous electrical maintenance related work for 365 days on as and when required at chp kakri project.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise