Tender Details

Particulars Details
Title
Assistance For Running Maintenance Work In Pump For 120 Days During Monsoon 2024 25 In Kakri Project
Description
Assistance For Running Maintenance Work In Pump For 120 Days During Monsoon 2024 25 In Kakri Project
Organisation Northern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_NCL_304303_1
Reference
Number
NCL/KKR/ENM/Tender/2023-24/514
Tender Fee 0
EMD 3000
Tender Value -
Place Kakri Project
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=315250

Start Date March 14, 2024 14:30
End Date
Expired 25/03/2024

Expired 912 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Repairing of lt ers, motor, field switches, transformer etc during monsoon 2024-25 (monsoon activity no.06) in kakri project.

Repairing of lt ers, motor, field switches, transformer etc during monsoon 2024-25 (monsoon activity no.06) in kakri project.

Read more
Repairing of lt ers, motor, field switches, transformer etc during monsoon 2024-25 (monsoon activity no.06) in kakri project.

Repairing of lt ers, motor, field switches, transformer etc during monsoon 2024-25 (monsoon activity no.06) in kakri project.

Read more
Repairing of lt ers, motor, field switches, transformer etc during monsoon 2025-26 (monsoon activity no.06) in kakri project.

Repairing of lt ers, motor, field switches, transformer etc during monsoon 2025-26 (monsoon activity no.06) in kakri project.

Read more
Repairing of lt ers, motor, field switches, transformer etc during monsoon 2025-26 (monsoon activity no.06) in kakri project.

Repairing of lt ers, motor, field switches, transformer etc during monsoon 2025-26 (monsoon activity no.06) in kakri project.

Read more
Repairing different size of valves and fabrication of universal joints during monsoon 2024-25 (monsoon activity no.08) in kakri project.

Repairing different size of valves and fabrication of universal joints during monsoon 2024-25 (monsoon activity no.08) in kakri project.

Read more
Repairing different size of valves and fabrication of universal joints during monsoon 2025-26 monsoon activity no.08 in kakri project

Repairing different size of valves and fabrication of universal joints during monsoon 2025-26 monsoon activity no.08 in kakri project

Read more
Assistance for 33kv overhead line maintenance during monsoon period 2024 for 100 days within 6 months at nigahi project.

Assistance for 33kv overhead line maintenance during monsoon period 2024 for 100 days within 6 months at nigahi project.

Read more
Dismantling, laying, repairing of pipelines 10, 12 for dewatering mine during monsoon 2024-25 (activity no. 1) in kakri project

Dismantling, laying, repairing of pipelines 10, 12 for dewatering mine during monsoon 2024-25 (activity no. 1) in kakri project

Read more
Upkeeping of industrial area for 730 days at kakri project

Upkeeping of industrial area for 730 days at kakri project

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise