Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Urgent Side Protection Of Right Bund Of Lbmc Canal At Ch 10/300 Km Urgent Side Protection Of Right Bund Of Lbmc At Ch 10/300 Km Of Vazhani Irrigation Project General Civil Work
|
| Description |
Earthwork Excavation, Cc 1 4 8 For Foundation Cc 1 3 6 For Side Wall Along With Plastering.The House Is Situated 2.20 Metre
Below Bund Level And No Access To Reach There.So
Rcc 1 1.5 3 For Steps
|
| Organisation | Government of Kerala |
| Tender Id | 2023_Irrig_616297_1 |
|
Reference Number |
IRR/IA/TR/67/2022_5_1_1/1 |
| Tender Fee | 655 |
| EMD | 7405 |
| Tender Value | - |
| Place | AEE irrigation subdivision Thalappilly |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | October 26, 2023 20:30 |
| End Date |
Expired
02/11/2023
Expired 1077 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
General karavaloor kip canal road work rectification lbmc bund road work between ch 14900m to 15600m general civil work
General karavaloor kip canal road work rectification lbmc bund road work between ch 14900m to 15600m general civil work
Read more-urgent repair of damaged canal lining and bed to prevent leakage between ch 7450m-7550m and repair of ramp at ch 7550m
Urgent repair of damaged canal lining and bed to prevent leakage
Read moreIip-crds-2025-26-replacing shutters of chalakudy branch canal, kalikkalkkunnu branch canal, aryankala branch canal and cross shutter for chalakudy branch canal at ch.0/800km
Iip-crds-2025-26-replacing shutters of chalakudy branch canal, kalikkalkkunnu branch canal, aryankala branch canal and cross shutter for chalakudy branch canal at ch.0/800km
Read moreGeneral iip crds rectification to lbmc 2025 2026 rectification works to lbmc between ch 1 400 km to 1450 km and rectification of spout at ch 3 200 km general civil work
Canal and spout rectification
Read moreGeneral deposit district panchayat 2026-27 cpp kkps urgent rectification of thekkepirivu branch canal at ch 0_380 to 0_410 and ch 0_550 to 0_565 km general civil work
Earth work exacavation cc 1_4_8 cc 1_3_6 cc 1_2 _4 centering and shuttering plastering etc
Read moreCarrying out survey investigation and design of proposed tunnel and aqueducts on chankapur right canal and chankapur right bank extended canal under nar par girna river link project
Carrying out survey investigation and design of proposed tunnel and aqueducts on chankapur right canal and chankapur right bank extended canal under nar par girna river link project
Read moreConstruction rcc trough lining including resection of canal bank cluster of ichhapur minor, under upper indravati right canal division no-l, mukhiguda.
Construction rcc trough lining including resection of canal bank cluster of ichhapur minor, under upper indravati right canal division no-l, mukhiguda.
Read moreModernization of field channel offtakes from the ch 3 300 km lhs of no 3 distributary canal para karimbiyankode field channel in between ch 0 030 km to 0 190 km ch 0.300 km to ch 0 550 km 1080
Modernization of field channel offtakes from the ch 3.300 km lhs of no.3 distributary canal para karimbiyankode field channel in between ch 0.030 km to 0.190 km ch 0.300 km to ch 0.550 km 1080.
Read moreScraping and jungle clearance of rasin right main canal from km 0.00 to 5.200 km (lot-5)
Scraping and jungle clearance of rasin right main canal from km 0.00 to 5.200 km
Read moreGeneral neyyar river basin urgent side protection works to the right bank of neyyar river nearby mukundara bridge in kallikkad panchayath parassala la general civil work
General neyyar river basin urgent side protection works to the right bank of neyyar river nearby mukundara bridge in kallikkad panchayath parassala la general civil work
Read moreof your Industry type