Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Cover Pucca Drain With Sock Pit Subodh Sarkar To Bappa Mondal San Ix
|
| Description |
Construction Of Cover Pucca Drain With Sock Pit Subodh Sarkar To Bappa Mondal San Ix
|
| Organisation | Zilla Parishad | State Govt. and UT |
| Tender Id | 2024_ZPHD_666571_4 |
|
Reference Number |
15thcfctiedfund512 |
| Tender Fee | 1000 |
| EMD | 7000 |
| Tender Value | |
| Place | KALUPUR |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1446138 |
| Start Date | February 14, 2024 17:35 |
| End Date |
Expired
20/02/2024
Expired 863 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Cons of drain from ranjit mondal house to bangore at simuldihi.(ac id-109661452)
Cons of drain from ranjit mondal house to bangore at simuldihi.(ac id-109661452)
Read moreInvestigation survey on gis basis and construction of 300 kld and 900 kld stp with 4 kld co treatment 19 no leach pit each capacity 10 kld i and d structure and drain work in nagar panchayat amethi distt lucknow up india
Investigation survey on gis basis and construction of 300 kld and 900 kld stp with 4 kld co &#x0d treatment 19 no leach pit each capacity 10 kld i and d structure and drain work in nagar &#x0d panchayat amethi distt lucknow up india
Read moreConstruction of rcc drain in ward no. 33 gaykhuri basti to hanuman mandir at nagar palika parishad balaghat
Construction of rcc drain in ward no. 33 gaykhuri basti to hanuman mandir at nagar palika parishad balaghat
Read more382/25-26-thrissur corporation ayyanthole zonal2025-26 division 48 r e c o n s t r u c t i o n n e w construction of drain and cover slab at
382/25-26-thrissur&#x0d corporation ayyanthole&#x0d zonal2025-26 division 48&#x0d r e c o n s t r u c t i o n n e w&#x0d construction of drain and cover&#x0d slab at
Read moreConstruction of cc road from gandhi chowk to sri siddeshwar temple in vijaypur city limits of vijaypur district. (including construction of duct, drain, foot-path and model street lighting)
Construction of cc road from gandhi chowk to sri siddeshwar temple in vijaypur city limits of vijaypur district. (including construction of duct, drain, foot-path and model street lighting)
Read more90.construction of cc road, drain, and slab from sonu house to vishnu general store, from lalu house to umesh house, and from shivnath house to sarnam house in mohalla ramnagar.
90.construction of cc road, drain, and slab from sonu house to vishnu general store, from lalu house to umesh house, and from shivnath house to sarnam house in mohalla ramnagar.
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreConstruction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Construction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreof your Industry type