Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Concrete Road With Bfs From Arobinda Mondal House To Bappa Sarkar House At Durgapur
|
| Description |
Construction Of Concrete Road With Bfs From Arobinda Mondal House To Bappa Sarkar House At Durgapur (Activity Code 66972307)
|
| Organisation | Zilla Parishad | State Govt. and UT |
| Tender Id | 2024_ZPHD_707938_1 |
|
Reference Number |
225/SB-II GP/2024 |
| Tender Fee | 500 |
| EMD | 6870 |
| Tender Value | |
| Place | DURGAPUR |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1549232 |
| Start Date | July 05, 2024 22:30 |
| End Date |
Expired
13/07/2024
Expired 734 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Detailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode
Detailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConstruction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Construction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of certain technical, administrative and married / single living accn with connected services at af stn deesa under ph-ii (designated as gp-iii)
Construction of certain technical, 
 administrative and married / single living 
 accn with connected services at af stn 
 deesa under ph-ii (designated as gp-iii)
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConstruction of rcc drain in ward no. 33 gaykhuri basti to hanuman mandir at nagar palika parishad balaghat
Construction of rcc drain in ward no. 33 gaykhuri basti to hanuman mandir at nagar palika parishad balaghat
Read moreof your Industry type