Tender Details

Particulars Details
Title
Construction Of Of Roof Top Rain Water Harvesting And Artificial Recharge To Ground Water Scheme At Chandra High School (Hs)
Description
Construction Of Of Roof Top Rain Water Harvesting And Artificial Recharge To Ground Water Scheme At Chandra High School (Hs) In Midnapore Sadar Block Of Paschim Medinipur District Under The Executive Engineer(a I), S.W.I.Division No. I,
Organisation STATE WATER INVESTIGATION DTE. | State Govt. and UT
Tender Id 2025_SWID_830062_1
Reference
Number
SWID/EE(AI)/MID/eNIT-10/24-25
Tender Fee 0
EMD 27600
Tender Value
Place CHANDRA HIGH SCHOOL
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1848409
Start Date March 26, 2025 16:30
End Date

11/04/2025 ( Expired 88 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii blocks of purba medinipur- wbdwsip/dww/em/03/2025-26

Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii block of purba medinipur district with 2 yrs. o and m wbdwsip/dww/em/03/2025-26

Read more
Consultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63

Consultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63

Read more
Consultancy services for authority engineer for supervision of construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu through an engineering, procu

Consultancy services for authority engineer for supervision of construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu through an engineering, procu

Read more
Construction of cc road and rcc drain at ward no 32 rakesh raikwar to ramdas soni to arti raikwar house municipal council narmadapuram mp.

Construction of cc road and rcc drain at ward no 32 rakesh raikwar to ramdas soni to arti raikwar house municipal council narmadapuram mp.

Read more
Applications for appointement of architectural consultancy firm (acf) / architect for architectural and project management consultancy services etc., through pre-qualification and design competition for construction of guest house for top executives and officers, at financial city, bagaluru, bengaluru, karnataka.

Applications for appointement of architectural consultancy firm (acf) / architect for architectural and project management consultancy services etc., through pre-qualification and design competition for construction of guest house for top executives and officers, at financial city, bagaluru, bengaluru, karnataka.

Read more
Construction of high level bridge work at nathari peeplu ranoli kathmana road (sh-121) bhopta nala nathari to peeplu road)

Construction of high level bridge work at nathari peeplu ranoli kathmana road (sh-121) bhopta nala nathari to peeplu road)

Read more
Construction of c.c. road and nali work at motiram yadav house to uttam neta ji house graam ganga mahalpur ward 63 file no. 124/22x3/6

Construction of c.c. road and nali work at motiram yadav house to uttam neta ji house graam ganga mahalpur ward 63 file no. 124/22x3/6

Read more
Construction of bt road from pani tanki to main road chatrapati school and different location in kidwai ward betul

Construction of bt road from pani tanki to main road chatrapati school and different location in kidwai ward betul

Read more
Master sewerage scheme faridabad- designing, construction and commissioning of 20 mld capacity stp on sbr technology with tertiary treatment to achieve the required parameters with 03 months trial run, 10 years of o and m etc.

Master sewerage scheme faridabad- designing, construction and commissioning of 20 mld capacity stp on sbr technology with tertiary treatment to achieve the required parameters with 03 months trial run, 10 years of o and m etc.

Read more
Water supply scheme at amarpur sub-divisional hospital/ sh- sinking of 01 (one) no. dtw scheme with contractors direct rotary normal drilling rig and related allied works etc. complete at amarpur sub-divisional hospital during the year 2023-24 (d

Water supply scheme at amarpur sub-divisional hospital/ sh- sinking of 01 (one) no. dtw scheme with contractors direct rotary normal drilling rig and related allied works etc. complete at amarpur sub-divisional hospital during the year 2023-24 (d

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise