Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Moulding, Casting, Fabrication And Lathe Work Of Pin Bus Type Rigid Coupling And Tyre Coupling With Finished Bore And Arrangement Of Pulley For Coupling Of Compressor And Motor For Sykes Pump Under Ashok Ocp, Ppr Area.
|
Description |
Moulding, Casting, Fabrication And Lathe Work Of Pin Bus Type Rigid Coupling And Tyre Coupling With Finished Bore And Arrangement Of Pulley For Coupling Of Compressor And Motor For Sykes Pump Under Ashok Ocp, Ppr Area.
|
Organisation | Coal India Limited (CIL) |
Tender Id | 2023_CCL_295050_1 |
Reference Number |
PO(AK)/PE(EnM)/e-NIT/23-24/84 |
Tender Fee | |
EMD | 4300 |
Tender Value | |
Place | Ashok OCP, Piparwar Area Chatra, Jharkhand-829201 |
Link | https://coalindiatenders.nic.in |
Start Date | December 02, 2023 14:30 |
End Date |
12/12/2023 ( Expired 572 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Provision of 25 no.s additional lightning arrestor by fabrication of 18 mtr height pole and erection of lightning arrestor on it with sky netting and suitable earthing for the wbs and 02 no.s checkpost under ashok ocp, ppr area
Provision of 25 no.s additional lightning arrestor by fabrication of 18 mtr height pole and erection of lightning arrestor on it with sky netting and suitable earthing for the wbs and 02 no.s checkpost under ashok ocp, ppr area
Read moreFabrication of 05 coupling 04nos,coupling for 2000gpm and 06 nos,for 1000 gpm pump motor side and pump side of topa project,under kuju area.
Fabrication of 05 coupling 04nos,coupling for 2000gpm and 06 nos,for 1000 gpm pump motor side and pump side of topa project,under kuju area.
Read moreCasting and machining of coupling 12 inch dia 04 no for pump and motor under bastacolla colliery.
Casting and machining of coupling 12 inch dia 04 no for pump and motor under bastacolla colliery.
Read moreLaying, erection of 8 inch pipe range 450mtrs with pump-motor, base plate installation, tanker filling point fabrication and switch-er laying at block-iv ocp departmental patch under govindpur area
Laying, erection of 8 inch pipe range 450mtrs with pump-motor, base plate installation, tanker filling point fabrication and switch-er laying at block-iv ocp departmental patch under govindpur area
Read moreMaking of new pin and rubber bush coupling assembly with other accessories of the four nos. of 2000 g.p.m., 150 m head pump set, in operation at karo ocp, bnk area
Making of new pin and rubber bush coupling assembly with other accessories of the four nos. of 2000 g.p.m., 150 m head pump set, in operation at karo ocp, bnk area
Read moreMaking and fabrication of float pontoons of 60 nos and 40 nos of hdpe drums for installation of pump motor on the pontoons at different sumps and fabrication of cgi sheet shed for fieldswitch and er at bhubaneswari ocp, bhubaneswari area
Making and fabrication of float pontoons of 60 nos and 40 nos of hdpe drums for installation of pump motor on the pontoons at different sumps and fabrication of cgi sheet shed for fieldswitch and er at bhubaneswari ocp, bhubaneswari area
Read moreSupply of single sleeve type gear coupling with finished bore and key way duly dynamically balanced suitable for voith model no.1150 svnl 21 18 5t for id fan input side hbk 180 1 no
Supply of single sleeve type gear coupling with finished bore and key way duly dynamically balanced suitable for voith model no.1150 svnl 21 18 5t for id fan input side hbk 180 1 no
Read moreDismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area
Dismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area
Read more(1) making of 04 nos. of motor dala end cover and 04 nos.bearing grease cap of at akwmc for 150hp and 167 hp.(2) fabrication of base plate h.t pump motor to be installed at ocp pump.(3) dismantling of 3000 gpm pump flow more an
(1) making of 04 nos. of 
 motor dala end cover and 
 04 nos.bearing grease cap 
 of at akwmc for 150hp and 
 167 hp.(2) fabrication of 
 base plate h.t pump motor 
 to be installed at ocp 
 pump.(3) dismantling of 
 3000 gpm pump flow more an
Read moreRepairs and rewinding of marathon make 150hp coupled type cage induction motor and manufacturing, fabrication, supply and fixing of 75hp impeller back side bracket bowl and replacement of 250mm dia. gate valve, nrv for 75hp at y.v. rao d.p station in circle-iii area
Repairs and rewinding of marathon make 150hp coupled type cage induction motor and manufacturing, fabrication, supply and fixing of 75hp impeller back side bracket bowl and replacement of 250mm dia. gate valve, nrv for 75hp at y.v. rao d.p station in circle-iii area rc.e3-108994/2025
Read moreof your Industry type