Tender Details
Particulars | Details |
---|---|
Title |
(A)modification And Repairing Of 2 Nos. Baseplate And Matching Work For Installation Of 2000 Gpm Pump At 3 No. Quarry Along With (B)providing And Fixing Of 3 No. Ci Coupling Set (1 Set Motor,1 Pump) By Moulding,Casting And Machining Of C.I Metal
|
Description |
(A)modification And Repairing Of 2 Nos. Baseplate And Matching Work For Installation Of 2000 Gpm Pump At 3 No. Quarry Along With (B)providing And Fixing Of 3 No. Ci Coupling Set (1 Set 1 Motor,1 Pump) By Moulding,Casting And Machining Of C.I Metal
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_322887_1 |
Reference Number |
KTC/PE/EnM/24-25/178 Date-07.12.2024 |
Tender Fee | 0 |
EMD | 5200 |
Tender Value | |
Place | P.E. (EnM), Office of the PO, Kathara Colliery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=334689 |
Start Date | December 09, 2024 15:30 |
End Date |
19/12/2024 ( Expired 168 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing of 270 hp motor gaughat pump set no.1
Repairing of 270 hp motor gaughat pump set no.1
Read more(a)part repairing casting machining molding and new making or supply and fixing of spares and parts of mla5 pump kirloskar make project sn gvp/pump/01 500gpm 150m head and (b)part repairing casting machining molding and new making or suppl
(a)part repairing casting machining molding and new making or supply and fixing of spares and parts of mla5 pump kirloskar make project sn gvp/pump/01 500gpm 150m head and (b)part repairing casting machining molding and new making or suppl
Read morePeriodical cleaning of pump house no 1, 2, 3, 7, 11 and 13 including cleaning of all types of tanks, sump and well, repairing of pump / motor alongwith connected items, repair to ps tank and various type of valve sets at afs under ge (af) jorhat
Periodical cleaning of pump house no 1, 2, 3, 7, 11 and 13 including cleaning of all types of tanks, sump and well, repairing of pump / motor alongwith connected items, repair to ps tank and various type of valve sets at afs under ge (af) jorhat
Read moreComplete repairing and overhauling of pullen make 120 hp, 550v, 2900rpm submersible motor 6 stage pump at godhur 3 no. under ngk colliery of kusunda area
Complete repairing and overhauling of pullen make 120 hp, 550v, 2900rpm submersible motor 6 stage pump at godhur 3 no. under ngk colliery of kusunda area
Read moreComplete repairing of k.e. make 90 hp, 3 phase, 550 volt slip ring motor at 15 no. direct haulage at pit no. 2 and prabhu make 150 hp, 550 v, 3 phase star-delta ers lying at fan house at pit no. b of pandaveswar colliery under pandaveswar area
Complete repairing of k.e. make 90 hp, 3 phase, 550 volt slip ring motor at 15 no. direct haulage at pit no. 2 and prabhu make 150 hp, 550 v, 3 phase star-delta ers lying at fan house at pit no. b of pandaveswar colliery under pandaveswar area
Read moreGiddalur nagara panchayat - bps2019 lrs 2020 grant - drilling of 165mm dia borewell fixing of 7.50 hp motor pump at rtc depo oppsite site area and laying of distribution net work from nandyala vara lakshmi house (d.no 8-17-78/6 to kasireddy house (d.no 8-17-50) in ward no 1
Giddalur nagara panchayat - bps2019 lrs 2020 grant - drilling of 165mm dia borewell fixing of 7.50 hp motor pump at rtc depo oppsite site area and laying of distribution net work from nandyala vara lakshmi house (d.no 8-17-78/6) to kasireddy house (d.no 8-17-50) in ward no 1
Read moreFor lifting, lowering and repairing of 7.5hp submersible pump motor from borehole no. 3 and 5 at new jagjiwan nagar colony under kusunda area
For lifting, lowering and repairing of 7.5hp submersible pump motor from borehole no. 3 and 5 at new jagjiwan nagar colony under kusunda area
Read moreFixing of new picks holder with picks in crusher drum and repairing for kessurgarh f/b no-1 of abocp mine under block-ii area
Fixing of new picks holder with picks in crusher drum and repairing for kessurgarh f/b no-1 of abocp mine under block-ii area
Read moreDismantling and shifting 1 no, pump with motor with reinstallation 90kw, 550v motor with 100hp. 3 stage pump at docp 38 quarry for raw water supply at docp staff colony, enm water reservoir and railway siding colony
Dismantling and shifting 1 no, pump with motor with reinstallation 90kw, 550v motor with 100hp. 3 stage pump at docp 38 quarry for raw water supply at docp staff colony, enm water reservoir and railway siding colony
Read moreReplacement of under ground water supply pipe line and 1 no. sinking of (200 x 100) mm dia deep tubewell and installation of 7.5 hp submersible pump motor set system of pump room no.1 at belghoria phe. (2nd call)
Replacement of under ground water supply pipe line and 1 no. sinking of (200 x 100) mm dia deep tubewell and installation of 7.5 hp submersible pump motor set system of pump room no.1 at belghoria phe. (2nd call)
Read moreof your Industry type