Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Turbine Spares
|
| Description |
Turbine Spares
|
| Organisation | Haryana Board Corporation | State Govt. and UT |
| Tender Id | 2025_HBC_470686_1 |
|
Reference Number |
ROHTAKSUGAR PUR/08.09.2025/12 |
| Tender Fee | 1280 |
| EMD | 0 |
| Tender Value | - |
| Place | SUGAR MILLS ROHTAK |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=548568 |
| Start Date | September 08, 2025 17:30 |
| End Date |
Expired
17/09/2025
Expired 394 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of braun make spares for turbine bfp and hydro turbine
Procurement of braun make spares for turbine bfp and hydro turbine speed measuring instruments for stage 2 3 4 5
Read moreProcurement of spares for rfccu mab dhds rgc turbine
Procurement of spares for rfccu mab dhds rgc turbine
Read moreRepair/ re conditioning of damaged/worn out turbine spares of vugph.
Repair/ re conditioning of damaged/worn out turbine spares of vugph as outlined in section 7 of the tender document
Read morePocurement of sanmar nrv valve spares for condensete system at turbine
Pocurement of sanmar nrv valve spares for condensete system at turbinest 1 ntpc lara
Read moreProcurement of spares for hp turbine for coh of 250mw kwu turbine set of unit no. 11, stps, mppgcl, sarni.
Procurement of spares for hp turbine for coh of 250mw kwu turbine set of unit no. 11, stps, mppgcl, sarni.
Read moreProcurement of asco make sov and spares used in ahp boiler and turbine
Procurement of asco make sov and spares used in ahp boiler and turbineof ntpc tanda
Read moreMain steam turbine control fluid system spares for accumulator bladder assembly model: s-35-b-m50-c,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,drive turbine governing oil system spares for accumulator bladder assembly model: s-35-b-m50-c-v cap
Main steam turbine control fluid system spares for accumulator bladder assembly model: s-35-b-m50-c,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,drive turbine governing oil system spares for accumulator bladder assembly model: s-35-b-m50-c-v cap
Read moreProcurement of balancing weight and other spares for main turbine at stg-ii, sgtpp.
Procurement of balancing weight and other spares for main turbine at stg-ii, sgtpp.
Read moreTurbine flow meter,turbine flow meter,turbine flow meter
Turbine flow meter,turbine flow meter,turbine flow meter
Read moreSupply of spares for pressure, temperature and flow switches in various locations of boiler and turbine areas
Supply of spares for pressure, temperature and flow switches in various locations of boiler and turbine areas
Read moreof your Industry type