Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Sa Div: Provision Of Subway In Lieu Of Lc No 140 At Km 461/800 900 In Ed Igu Section With Roof Cover, Pumping &Amp Drainage Arrangement.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 78059934 |
|
Reference Number |
SA-OT-13-2024-04 |
| Tender Fee | 0 |
| EMD | 4.2 Lakh |
| Tender Value | - |
| Place | Chennai |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/112024/78059934/viewNitPdf_4749030.pdf |
| Start Date | October 28, 2024 22:23 |
| End Date |
Expired
19/11/2024
Expired 698 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Sw.i: provision of subway in lieu of lc.no.67 at km 65/500-600 in sa-vri section.sw.ii:proposed construction of lus in lieu of lc no.171 of sa-vri section
Sw.i: provision of subway in lieu of lc.no.67 at km 65/500-600 in sa-vri section.sw.ii:proposed construction of lus in lieu of lc no.171 of sa-vri section
Read moreHyb division: sc-mue section: construction of road under bridge in lieu of lc no. 255 at km 616/700-800 between cavalry barracks & malkajgiri station by air pushing method with rh girder.
Hyb division: sc-mue section: construction of road under bridge in lieu of lc no. 255 at km 616/700-800 between cavalry barracks & malkajgiri station by air pushing method with rh girder.
Read moreSouth coast railway: vijayawada division:signal and telecom deparment: s&t works in connection with (1) vijayawada- kondapalli section: proposed constrcution of rub in lieu of lc no.140 at railway km.569/31-33 between ki-ryp. (2) bza-gdr section: proposed constrcution of rub in lieu of lc no.113 at railway km.169/24-26 between vde-nlr stations. (3) bza-gdr section: proposed constrcution of rub in lieu of lc no.112 at railway km.168/16-18 between vde-nlr stations. (4) bza-gdv section: prop
South coast railway: vijayawada division:signal and telecom deparment: s&t works in connection with (1) vijayawada- kondapalli section: proposed constrcution of rub in lieu of lc no.140 at railway km.569/31-33 between ki-ryp. (2) bza-gdr section: proposed constrcution of rub in lieu of lc no.113 at railway km.169/24-26 between vde-nlr stations. (3) bza-gdr section: proposed constrcution of rub in lieu of lc no.112 at railway km.168/16-18 between vde-nlr stations. (4) bza-gdv section: prop
Read more1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:
1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:
Read more1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.
1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.
Read moreTender for construction of the proposed road over bridge rob at rly. km. 460-13 ,15 in lieu of lc. no. 202 in between kur kpxr stations on kur psa main line along with limited height subway lhs and other allied works.
Tender for construction of the proposed road over bridge rob at rly. km. 460-13 ,15 in lieu of lc. no. 202 in between kur kpxr stations on kur psa main line along with limited height subway lhs and other allied works.
Read moreConstruction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read moreConstruction of limited height subway (lhs) in lieu of existing manned level crossings (1)lc no.23 at km 99/18-20 in between hcnr & nkw stations, (2) lc no.14 at km 55/23-25 in between gadh & kdjr stations (3) lc no.08 at km 44/18-16 in between gadh & prnr on jkpr-jrli line and (4) lc no. cp-1 at km 411/15-1 7 in between ctc & kdrp stations on ctc-prdp line of khurda road division. (by air pushing technique)
Construction of limited height subway (lhs) in lieu of existing manned level crossings (1)lc no.23 at km 99/18-20 in between hcnr & nkw stations, (2) lc no.14 at km 55/23-25 in between gadh & kdjr stations (3) lc no.08 at km 44/18-16 in between gadh & prnr on jkpr-jrli line and (4) lc no. cp-1 at km 411/15-1 7 in between ctc & kdrp stations on ctc-prdp line of khurda road division. (by air pushing technique)
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read moreTrd work against various engg works over firozpur division in c/w (i)- elimination of manned l-xing no. s-63 at km 433/27-28 by providing limited height subway of internal size 5m x 5m on juc-bes section (between juc-srx) by pushing method in the section under aden/juc (ii)- provision of 3.00m wide covered light weight rob near lc no. s-3 on ldh-dui section under aden/ldh, (iii)- construction of 5m x 3.5m lhs in lieu of closed level crossing no. c-7 on juc-nro section by pushing method under a
Trd work against various engg works over firozpur division in c/w (i)- elimination of manned l-xing no. s-63 at km 433/27-28 by providing limited height subway of internal size 5m x 5m on juc-bes section (between juc-srx) by pushing method in the section under aden/juc (ii)- provision of 3.00m wide covered light weight rob near lc no. s-3 on ldh-dui section under aden/ldh, (iii)- construction of 5m x 3.5m lhs in lieu of closed level crossing no. c-7 on juc-nro section by pushing method under a
Read moreof your Industry type