Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Hand Pump Erection And Platform Construction Of Existing Bore Well At Odapallam Paniya Colony In Noolpuzha Panchayath
|
| Description |
Hand Pump Erection
|
| Organisation | Ground Water Department | State Govt. and UT |
| Tender Id | 2024_GWD_674037_1 |
|
Reference Number |
GW/DW/T/630/23 |
| Tender Fee | 500 |
| EMD | 1100 |
| Tender Value | - |
| Place | Noolpuzha |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1050746 |
| Start Date | June 14, 2024 16:30 |
| End Date |
Expired
28/06/2024
Expired 835 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreShifting and erection of existing ht tgfenco poles towards lingapuram for road widening works in rmc (under gf) (2nd call)
Shifting and erection of existing ht tgfenco poles towards lingapuram for road widening works in rmc (under gf) (2nd call)
Read moreDrilling of bore well at lenin nagar muslim graveyard under rodamestrinagar ward-279 at chintal circle-54,qpz,cmc (item no.6) (completion period 1 month)
Drilling of bore well at lenin nagar muslim graveyard under rodamestrinagar ward-279 at chintal circle-54,qpz,cmc (item no.6) (completion period 1 month)
Read moreDrilling of bore well at bhagath singmarg graveyard under rodamestri nagar ward-279 at chintal circle-54,qpz,cmc. (item no.4) (completion period 1 month)
Drilling of bore well at bhagath singmarg graveyard under rodamestri nagar ward-279 at chintal circle-54,qpz,cmc. (item no.4) (completion period 1 month)
Read moreDrilling of bore well installation of pumpset and laying of pipeline with 02 syntax water tanks at ward no 06 in bichkunda municipality under 15th finance commission funds.
Drilling of bore well installation of pumpset and laying of pipeline with 02 syntax water tanks at ward no 06 in bichkunda municipality under 15th finance commission funds.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreDrilling of bore well at lenin nagar hindu graveyard under rodamestrinagar ward-279 at chintal circle-54,qpz,cmc (item no.5) (completion period 1 month) (reserved for st)
Drilling of bore well at lenin nagar hindu graveyard under rodamestrinagar ward-279 at chintal circle-54,qpz,cmc (item no.5) (completion period 1 month) (reserved for st)
Read moreDrilling of bore well installation of pumpset and laying of pipeline with syntax water tanks at beside parameshwari theatre at ward no.6 in bichkunda municipality under 15th finance commission funds.
Drilling of bore well installation of pumpset and laying of pipeline with syntax water tanks at beside parameshwari theatre at ward no.6 in bichkunda municipality under 15th finance commission funds.
Read moreDrilling of bore well installation of pumpset at boyiwada near old hanuman mandir in ward no.3 and flushing of bores at various locations of bichkunda municipality under 15th finance commission funds.
Drilling of bore well installation of pumpset at boyiwada near old hanuman mandir in ward no.3 and flushing of bores at various locations of bichkunda municipality under 15th finance commission funds.
Read moreCconstruction of 20 nos. 125mm x 40mm dia x 61 meter deep and 10 nos. 125mm x 48 meter deep / hand operated t/well with india mark ii hand pump with plateform,drain and soakpit in place of old defuct/ordinary hand pumps in the water scarce area under p.h.division, biharsharif for the year 2026-27.
Cconstruction of 20 nos. 125mm x 40mm dia x 61 meter deep and 10 nos. 125mm x 48 meter deep / hand operated t/well with india mark ii hand pump with plateform,drain and soakpit in place of old defuct/ordinary hand pumps in the water scarce area under p.h.division, biharsharif for the year 2026-27.
Read moreof your Industry type