Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Ab Cable Replacement Work Under Edd Ballia Nagar Edd Ballia Nagar Under Abp 2024 25
|
Description |
Ab Cable Replacement Work Under Edd Ballia Nagar Edd Ballia Nagar Under Abp 2024 25&Amp#X0d
|
Organisation | Purvanchal Vidyut Vitran Nigam Limited Varanasi | State Govt. and UT |
Tender Id | 2024_MVVNL_941625_1 |
Reference Number |
33/EDC(B)/2024-25 |
Tender Fee | 1180 |
EMD | 7500 |
Tender Value | |
Place | EDD-Ballia Nagar |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1726937 |
Start Date | December 07, 2024 18:30 |
End Date |
16/12/2024 ( Expired 198 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Reconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode
Reconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode
Read moreConstruction/strengthening of mrf/composting plant work under sbm (urban) 2.0 in nagar parishad lateri
Construction/strengthening of mrf/composting plant work under sbm (urban) 2.0 in nagar parishad lateri
Read moreRepairs and maintenance of 11 kv ht cable, switch gear, ring main unit, master relay, metering equipment, 11 kv 0.433kv distribution transformer, compact sub station including re-winding, oil filtering, painting etc and connected work under ge belgam
Repairs and maintenance of 11 kv ht cable, switch gear, ring main unit, master relay, metering equipment, 11 kv 0.433kv distribution transformer, compact sub station including re-winding, oil filtering, painting etc and connected work under ge belgam
Read moreConstruction work of mrf centre in nagar parishad, niwas under sbm 2.0
Construction work of mrf centre in nagar parishad, niwas under sbm 2.0
Read moreFor the work of residual life assessment test of 40 mva transformer-i (gec alsthom make) at 220 kv substation sarh and 40 mva transformer -i (gec alsthom make) and 40 mva transformer -iii (alstom make) at 132kv substation krishna nagar under etd-ii,
For the work of residual life assessment test of 40 mva transformer-i (gec alsthom make) at 220 kv substation sarh and 40 mva transformer -i (gec alsthom make) and 40 mva transformer -iii (alstom make) at 132kv substation krishna nagar under etd-ii,
Read moreLandslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreErection work of 132 kv tendum isolators at 132 kv s/s foundry nagar
Erection work of 132 kv tendum isolators at 132 kv s/s foundry nagar under etd-ii agra
Read moreReplacement of new intake pipe line (approx. length 500 meters) under tm dept., stps under capex 24-25
Replacement of new intake pipe line (approx. length 500 meters) under tm dept., stps under capex 24-25
Read moreSpecial repair of link roads under special repair programme year 2022-23 2023-24 and 2024-25 from earth work upto premix carpet and road furniture safety measures with 5 year maintenance mc batala, fatehgarh churian and dera baba nanak group no-1
Special repair of link roads under special repair programme year 2022-23 2023-24 and 2024-25 from earth work upto premix carpet and road furniture safety measures with 5 year maintenance mc batala, fatehgarh churian and dera baba nanak group no-1
Read moreof your Industry type