Tender Details
Particulars | Details |
---|---|
Title |
Working Down Timber, Teak Poles, Billets And Jungle Wood Fire Wood From 1955 Tp Valiyakondody Under Kokkathodu Forest Station Of Naduvathumoozhy Range
|
Description |
Working Down Timber, Teak Poles, Billets And Jungle Wood Fire Wood From 1955 Tp Valiyakondody Under Kokkathodu Forest Station Of Naduvathumoozhy Range
|
Organisation | Forest Department | State Govt. and UT |
Tender Id | 2025_FD_730488_1 |
Reference Number |
KNC1-60729/24 |
Tender Fee | 5900 |
EMD | 50000 |
Tender Value | |
Place | kokkathodu |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1165159 |
Start Date | January 25, 2025 22:30 |
End Date |
04/02/2025 ( Expired 103 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mechanized cleaning of vegetation and cutting of grass around runway including cleaning of dm range area by tractor with jungle jim at af station tezpur under ge (af) tezpur
Mechanized cleaning of vegetation and cutting of grass around runway including cleaning of dm range area by tractor with jungle jim at af station tezpur under ge (af) tezpur
Read moreFelling and working down trees (164 nos) at 2002 tp karayalarmeth to favcilitate the construction of elephant proof trench along the plantation boundary from chenagiri to aryanakvu old railway station under aryanakvu range during 2025-26
Felling and working down trees (164 nos) at 2002 tp karayalarmeth to favcilitate the construction of elephant proof trench along the plantation boundary from chenagiri to aryanakvu old railway station under aryanakvu range during 2025-26
Read moreEstimate for the cost of 2nd and 3rd year maintenance of 2024tp nerchappara in panakkadan series over an area of 8.00ha in thiruvizhamkunnu forest station under mannarkkad range during 2025-26
Estimate for the cost of 2nd and 3rd year maintenance of 2024tp nerchappara in panakkadan series over an area of 8.00ha in thiruvizhamkunnu forest station under mannarkkad range during 2025-26
Read moreEstimate for the cost of supply and installation of solar power fence at 4 km from kodumudi apc to anchumukku under chittar forest station of vadasserikkara range durting 2024-25
Estimate for the cost of supply and installation of solar power fence at 4 km from kodumudi apc to anchumukku under chittar forest station of vadasserikkara range durting 2024-25
Read moreEstimate for the cost of cutting and removal of teak trees from 1974 tp alathur to facilitate construction of aww office building for tholpetty wild life office in alathur rf of begur section under begur range during 2025-26
Estimate for the cost of cutting and removal of teak trees from 1974 tp alathur to facilitate construction of aww office building for tholpetty wild life office in alathur rf of begur section under begur range during 2025-26
Read moreEstimate for the cost of maintanance of 2nd year gap planting of misc. seedlings after selection removal in1957 and 1958 tp -9.12 ha-teak plantaion in walayar section under walayar range during 2025-26
Estimate for the cost of maintanance of 2nd year gap planting of misc. seedlings after selection removal in1957 and 1958 tp -9.12 ha-teak plantaion in walayar section under walayar range during 2025-26
Read moreEstimate for the cost of maintanance of 2nd year eco-restoration of 1964 and 1967 tp -gap planting of misc. seedlings- 20 ha teak plantaion in poolamppara water shed of walayar section under walayar range during 2025-26
Estimate for the cost of maintanance of 2nd year eco-restoration of 1964 and 1967 tp -gap planting of misc. seedlings- 20 ha teak plantaion in poolamppara water shed of walayar section under walayar range during 2025-26
Read moreErection of 3.3 kv o/h line from kali mandir sub-station to pumping statio of hired patch-c and dismantling and erection of 11kv o/h line for clearing working area of proposed patch-c of abg colliery under govindpur area
Erection of 3.3 kv o/h line from kali mandir sub-station to pumping statio of hired patch-c and dismantling and erection of 11kv o/h line for clearing working area of proposed patch-c of abg colliery under govindpur area
Read moreDr.nttps-om-civil-clearing the light jungle in road no. 1 4, abc road, water treatment plant, fire station, both sides of compound wall from new gate to budameru near cooling towers via old gate areas 220kv switch yard bays empty bays and cleaning of storage tanks and sludge pits of bcw pump house stage-iii during the year 2025-26.
Dr.nttps-om-civil-clearing the light jungle in road no. 1 4, abc road, water treatment plant, fire station, both sides of compound wall from new gate to budameru near cooling towers via old gate areas 220kv switch yard bays empty bays and cleaning of storage tanks and sludge pits of bcw pump house stage-iii during the year 2025-26.
Read moreWoking down timber, poles, billets and firewood from the wind fallen rosewood tres at 2024 tp ezhuthukal and working down timber, poles billets and firewood from the wind fallen teak and misc. tress in 1909 and 1919 tp nedumgayam
Woking down timber, poles, billets and firewood from the wind fallen rosewood tres at 2024 tp ezhuthukal and working down timber, poles billets and firewood from the wind fallen teak and misc. tress in 1909 and 1919 tp nedumgayam
Read moreof your Industry type