Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Conducting Scientific Study By External Agency At Level Of Iit/Nit To Study For Dumping Over 90.0 Meter Height Of Internal Dump, Design Of Ob Benches(hard, Soft/Bc), And Blast Design For Coal Mine At Amalgamated
|
| Description |
Conducting Scientific Study By External
Agency At Level Of Iit/Nit To Study For
Dumping Over 90.0 Meter Height Of
Internal Dump, Design Of Ob
Benches(hard, Soft/Bc), And Blast
Design For Coal Mine At Amalgamated
|
| Organisation | Western Coalfields Limited | Central Govt. Ministry/Department |
| Tender Id | 2024_WCL_771824_1 |
|
Reference Number |
ma4450-saf-0002-2024-25 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Amalgamated Yekona I , II OC MINE MA WCL |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1075664 |
| Start Date | September 16, 2024 20:00 |
| End Date |
Expired
01/10/2024
Expired 744 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreTender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl
Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreConducting feasibility study, investigation, detailed survey and detailed project report preparation and detailed design work in connection with elimination of level crossings by constructing 09 robs on following level crossings on jabalpur division of wcr.1) itarsi - jabalpur section 03 nos ( lc no. 285, 305 & 309) (2) jabalpur - manikpur section - 02 nos (lc no. 328 & 340) (3) katni - singrauli section - 02 nos (lc no. 67 & 88) (4) katni - satna section - 02 nos (one common ro
Conducting feasibility study, investigation, detailed survey and detailed project report preparation and detailed design work in connection with elimination of level crossings by constructing 09 robs on following level crossings on jabalpur division of wcr.1) itarsi - jabalpur section 03 nos ( lc no. 285, 305 & 309) (2) jabalpur - manikpur section - 02 nos (lc no. 328 & 340) (3) katni - singrauli section - 02 nos (lc no. 67 & 88) (4) katni - satna section - 02 nos (one common ro
Read moreConducting scientific study by external agency at level of iit/nit to study for dumping over 90.0 meter height of internal dump, design of ob benches(hard, soft/bc), and blast design for coal mine
Conducting scientific study by external
 agency at level of iit/nit to study for
 dumping over 90.0 meter height of
 internal dump, design of ob
 benches(hard, soft/bc), and blast
 design for coal mine
Read moreCustom bid for services - biodiversity study of reclaimed ob dump at krishnashila ocp and jayant oc
Read more
Nlcil-bp-conducting scientific study for opencast blm to determine ultimate pit, bench and dump slop
Nlcil-bp-conducting scientific study for opencast blm to determine ultimate pit, bench and dump slop
Read moreProposal for ob dump survey and preparation of contour map, section of dumping bench for highwall and ocp of nimcha(r)colliery
Proposal for ob dump survey and preparation of contour map, section of dumping bench for highwall and ocp of nimcha(r)colliery
Read moreDi of 6.6kv o/h line due to widening and making of new haul road for ob dumping and coal dump and di of 440v o/h line due to coal dump in socp of muraidih, amp colliery
Di of 6.6kv o/h line due to widening and making of new haul road for ob dumping and coal dump and 
 di of 440v o/h line due to coal dump in socp of muraidih, amp colliery
Read moreShifting/erection of lt overhead line for lighting purpose with ixing of control switches along the haul road of ob dumping from p-6 junction to external dump p-8 patch(existing) and external dump for 10 year contract (under construction) vi a rh jun
Shifting/erection of lt overhead line for lighting purpose with ixing of control switches along the haul road of ob dumping from p-6 junction to external dump p-8 patch(existing) and external dump for 10 year contract (under construction) vi a rh jun
Read moreof your Industry type