Tender Details
Particulars | Details |
---|---|
Title |
Jobno.Hsvp/Amb/2024 25/E 322
|
Description |
A Mtc Of Ephs In Sector 7 Urban Estate Ambala City Hiring Of Jcb For Cleaning Of Jungle And Hiring Of Tractor Trolley For Shifting Of Malba To Suitable Site Complete In All Respect
|
Organisation | Haryana Board Corporation | State Govt. and UT |
Tender Id | 2024_HBC_410216_1 |
Reference Number |
2024C9CD0B12 7863 44B8 8603 0520526AD72E239HSV |
Tender Fee | 1430 |
EMD | 3380 |
Tender Value | |
Place | Ambala City |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=486737 |
Start Date | November 09, 2024 21:30 |
End Date |
18/11/2024 ( Expired 196 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Beautification of outer green belt sector-7 karnal from sai mandir to noor mahal chowk (construction of path with chequred tiles etc and all other works contingent thereto complete in all respect with three year mtc/defect liability period free of co
Beautification of outer green belt sector-7 karnal from sai mandir to noor mahal chowk (construction of path with chequred tiles etc and all other works contingent thereto complete in all respect with three year mtc/defect liability period free of co
Read moreBeautification of outer green belt sector-6 karnal from sai mandir to meerut road. (construction of path with chequred tiles etc and all other work contingent thereto complete in all respect with three year mtc /defect liability period of cost
Beautification of outer green belt sector-6 karnal from sai mandir to meerut road. (construction of path with chequred tiles etc and all other work contingent thereto complete in all respect with three year mtc /defect liability period of cost
Read moreDismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year
Dismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year
Read moreAAAAAAAAAA
Login to viewAmtc of ephs in sector 10 ue ambala construction of one no rcc water tank construction of damaged boundary wall providing and fixing of ms grill in sector 10 ambala city complete in all respect and all other works contingent thereto
Read moreAAAAAAAAAA
Login to viewA mtc of ephs in sector 10 u e ambala city soil investigation for the work of construction of fire station building in sector 23 ue ambala city complete all respect
Read moreAAAAAAAAAA
Login to viewA mtc of ephs in sector 10 ue ambala city providing security guard gun for watch and ward at water works sector 10 and stp sector 7 ambala city complete all respect
Read moreAnnual maintenance of sewerage scheme in sector 7 bahadurgarh
Hiring charges of jetting machine 2200 psi machine ic pol for cleaning of sewerage line in sector 7 bahadurgarh complete in all respect and all other works contingent thereto
Read moreProviding and fixing of 35-50 hp horizontal pump impreller, gun metal router with ss sleave horizontal and copper steve and machinery in t/well r-7, sector 24, panchkula extension complete in all respect and entire satisfaction of engineer-in-charge
Providing and fixing of 35-50 hp horizontal pump impreller, gun metal router with ss sleave horizontal and copper steve and machinery in t/well r-7, sector 24, panchkula extension complete in all respect and entire satisfaction of engineer-in-charge
Read moreConstruction of control panel room with attached toilet for tt water submersible motor pumping machinery and connection of sewerline in multifeatured park sector 24, panchkula complete in all respect and all other works contingent thereto (developmen
Construction of control panel room with attached toilet for tt water submersible motor pumping machinery and connection of sewerline in multifeatured park sector 24, panchkula complete in all respect and all other works contingent thereto (developmen
Read moreInstallation of tubewell/submersible boring complete in all respect for watering the plantation in subhash park mc ambala sadar
Installation of tubewell/submersible boring complete in all respect for watering the plantation in subhash park mc ambala sadar
Read moreof your Industry type