Tender Details
Particulars | Details |
---|---|
Title |
AAAAAAAAAA Login to view |
Description |
Construction Of Railing From Administrative Building To Main Gate At Jagannath Dham In The District Of Purba Medinipur.&Amp#X0d
&Amp#X0d
|
Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 19245 |
Tender Value | |
Place | New Digha, Purba Medinipur. |
Link |
AAAAAAAAAA Login to view |
Start Date | June 05, 2025 14:30 |
End Date |
13/06/2025 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreConstruction of underpasses at 5 blackspot locations in the project highway at specified locations from ch. 23.600 to ch. 149.900 of nh34 (old nh91) from ghaziabad to aligarh on epc mode in the state of uttar pradesh
Construction of underpasses at 5 blackspot locations in the project highway at specified locations from ch. 23.600 to ch. 149.900 of nh34 (old nh91) from ghaziabad to aligarh on epc mode in the state of uttar pradesh
Read moreConstr of bow string steel arch major bridge
Rfp for construction of bow string steel arch major bridge (2nos) across river iravanjippuzha in the
 kozhikode district of kerala state anakkampoyil kalladi meppadi package i
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreConstruction of mipi-andrathang road from km 20.000 to 50.000
Construction of mipi-andrathang road from km 20.000 to 50.000
 (design length 34.880 km between km 20.000 to 54.880)green field
 alignment to nhsl specifications in the aor of 62 rcc under 752 brtf
 of project udayak in arunachal pradesh state
Read moreOne time improvement of bypassed stretch of pamuru town from km. 109.950 to km. 116.750 of nh 167b in prakasam district in the state of andhra pradesh on epc mode
One time improvement of bypassed stretch of pamuru town from km. 109.950 to km. 116.750 of nh 167b in prakasam district in the state of andhra pradesh on epc mode
Read moreConsultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Consultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Read moreof your Industry type